Laserfiche WebLink
Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., <br />Monday through Friday. No work shall be performed on weekends or on City recognized <br />holidays without written SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for <br />Public Works Construction, latest edition, hereinafter referred to as Standard <br />Specifications. In case of conflict between the Standard Specifications and this <br />Specification, this Specification shall take precedence over and be used in lieu of such <br />conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not <br />complete detail, it is understood that workmanship of the finest quality is to be used. <br />Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />equipment and incidentals and do all the work involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of the public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on thejob or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />that are not related to the project, shall be kept at levels so as to not disturb the general <br />public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work <br />at least five (5) days before work is begun. The Contractor shall cooperate with local <br />authorities relative to handling traffic through the areas and shall make arrangements <br />relative to keeping the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, <br />whether empty or loaded, shall in all cases yield to public traffic. All traffic delineation