My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMS FACILITY SERVICES, LLC 2 - 2011
Clerk
>
Contracts / Agreements
>
D
>
DMS FACILITY SERVICES, LLC 2 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 9:34:58 AM
Creation date
7/7/2011 8:43:25 AM
Metadata
Fields
Template:
Contracts
Company Name
DMS FACILITY SERVICES, LLC
Contract #
A-2011-148
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/6/2011
Expiration Date
6/30/2012
Insurance Exp Date
3/1/2013
Destruction Year
2018
Notes
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Any damage to the City of Santa Ana, SAPRF, or private property, which has been <br />determined to be due to the Contractor's neglect, shall be corrected at no additional cost <br />to the City of Santa Ana or the SAPRF. <br />2.07 HOURS OF OPERATION <br />The Contractor shall perform all work between the hours of 7:00 a.m. and 4:00 p.m., <br />Monday through Friday. No work shall be performed on weekends or on City recognized <br />holidays without written SAPRF approval. <br />2.08 SPECIFICATIONS AND PLANS <br />The work performed shall be done in accordance with the Standard Specifications for <br />Public Works Construction, latest edition, hereinafter referred to as Standard <br />Specifications. In case of conflict between the Standard Specifications and this <br />Specification, this Specification shall take precedence over and be used in lieu of such <br />conflicting portions. <br />Where the plans or specifications describe portions of work in general terms, but not <br />complete detail, it is understood that workmanship of the finest quality is to be used. <br />Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, <br />equipment and incidentals and do all the work involved in executing the contract. <br />2.09 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment <br />and the protection of the public from injury and damage from such equipment. <br />2.10 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on thejob or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment. No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore. Sounds, such as loud music, <br />that are not related to the project, shall be kept at levels so as to not disturb the general <br />public. <br />2.11 TRAFFIC CONTROL <br />The Contractor shall notify the SAPRF representative of intent to begin the contract work <br />at least five (5) days before work is begun. The Contractor shall cooperate with local <br />authorities relative to handling traffic through the areas and shall make arrangements <br />relative to keeping the working area safe and clear of vehicles. <br />When entering or leaving roadways carrying public traffic, the Contractor's equipment, <br />whether empty or loaded, shall in all cases yield to public traffic. All traffic delineation
The URL can be used to link to this page
Your browser does not support the video tag.