My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARINA LANDSCAPE, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MARINA LANDSCAPE, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:53:21 AM
Creation date
7/7/2011 8:54:21 AM
Metadata
Fields
Template:
Contracts
Company Name
MARINA LANDSCAPE, INC.
Contract #
A-2011-150
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/6/2011
Expiration Date
6/30/2012
Insurance Exp Date
8/1/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Level and drag warning track areas using nail drag followed by finishing drag mats. Contractor shall apply <br />new brick dust to fence lines and warning tracks as necessary to maintain consistent 1/2" layer of brick dust <br />in these areas. <br />c) Weekly Maintenance <br />Contractor will then edge the fence lines and warning track to achieve crisp straight lines and a smooth crisp <br />arc where the brickdust warning track meets the sport turf. <br />d) Annual Maintenance <br />Top dress outfield turf using Santa Ana mix or approved product. Apply with an approved top dressing <br />machine that will achieve a level playing surface. (The "Santa Ana Mix" is sold by AG Organic, Riverside. <br />The specification is: AG Organic Company Organigro Seed Topdress premixed w/Califomia Organic <br />Fertilizer, Inc. Phyta Boost Plant Food 7-1-2 (33cy of Organigro Seed Topdress +700#'s 7-1-2 Phyta Boost per <br />Acre)). <br />e) Non-recurring maintenance: <br />During inclement weather the Contractor shall work to reopen baseball fields as soon as possible. The <br />Contractor shall use Diamond Dry or an approved equal to warning tracts and fence lines. In addition, the <br />Contractor shall use hand pumps or any other reasonable method necessary to drain water off the field. <br />11. Soccer /Football Field Maintenance <br />a) All soccer/football fields shall be inspected every day, Monday through Friday. Contractor shall look for <br />divots, depressions, debris, and other turf marring conditions. If discovered, the Contractor shall fill in divots <br />and depressions with #20 white silica sand mixed with Stovers Bermuda Dunes grass seed during the <br />spring/summer and Stovers Grand Slam perennial rye grass seed during the fall winter to re-establish the <br />areas. <br />b) Areas of the field where turf has been worn away due to play shall be raked, dragged and leveled each day to <br />provide a level -playing surface free of divots, depressions and uneven surfaces. The Contractor shall add <br />approved topsoil to these areas as necessary to keep the areas level and safe. <br />c) Annually, the Contractor shall top dress outfield turf using Santa Ana mix or approved product. Apply with an <br />approved top dressing machine that will achieve a level playing surface. <br />d) The Dan Young Soccer Complex and Santa Ana Stadium Field Synthetic Turf: Contractor shall remove all <br />debris from synthetic turf fields daily. City crews will provide the daily field grooming. <br />12. Snort Court Maintenance <br />a) All sport courts shall be blown off weekly. Courts and fence lines shall be completely free of dirt, debris, etc. <br />b) All tennis courts shall be washed down every other week to remove dust, gum and stains. The courts shall <br />have water removed immediately following the washing down. <br />c) All basketball and volleyball courts shall be washed down monthly to remove dust, gum and stains. The courts <br />shall have water removed immediately following the washing down. <br />d) Contractor shall replace tennis and basketball nets when they become wom. The City shall furnish nets. <br />13. General Maintenance and Clean -Up For All Parks and Contracted Sites <br />a) All trash and debris on the ground or in trash receptacles shall be removed from all worksites each day <br />Monday through Sunday before 12:00 p.m. This includes all landscape areas, paved areas, street curb gutters, <br />
The URL can be used to link to this page
Your browser does not support the video tag.