Laserfiche WebLink
Heritage Park: 1 Day per wk Year round <br />Jerome Park: Field #1 <br />4.0 Field Composition Mix (Brickdust) To Be Used When Maintaining In -fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of <br />material to be used is: Pro Gold Infield Mix with stabilizer from Gail Materials (951) 279-1095. <br />4.2 Pitchers Mound/Home Plate/Basepath Areas <br />When adding a mix with a higher clay composition material to any pitcher's mound/home plate/base-path <br />area, the specific type of material to be used is: Hill Topper Home Plate and Mound Mix. <br />5.0 Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation the following <br />equipment. <br />5.1 Utility Vehicle <br />Small tight tum radios (13') vehicle designed especially for this type of work. This vehicle shall have the <br />capability to make circle and figure eight patterns completely within the skinned brickdust infield area and <br />5 Days per wk, Feb 1 st to July 15th <br />I Day per wk, July 16th to Jan 31st <br />Field #2 & #3 <br />1 Days per wk Year round <br />Madison Park: <br />5 Days per wk , Feb I st to July 15th <br />3 Day per wk, July 16th to Jan 31 st <br />Memorial Park: <br />5 Days per wk, Feb 1 st to July 15th <br />1 Day per wk July 16th to Jan 31 st <br />Morrison Park: <br />3 Days per wk, Feb 1 st to July 15th <br />1 Day per wk July 16th to Jan 31 st <br />Portola Park: <br />3 Days per wk, Feb I st to July 15th <br />1 Day per wk, July 16th to Jan 31st <br />Riverview Park: <br />5 Days per wk, Feb I st to July 15th <br />3 Day per wk, July 16th to Jan 31st <br />Rosita Park: <br />5 Days per wk, March 1 st to July 30th <br />1 Day per wk, July 30th to Feb 28th <br />Santiago Park: <br />5 Days per wk Year round <br />Thornton Park: <br />5 Days per wk Year round <br />Windsor Park: <br />3 Days per wk Feb 1st to July 15th <br />1 Day per wk July 16th to January 31 st <br />4.0 Field Composition Mix (Brickdust) To Be Used When Maintaining In -fields. <br />4.1 Field In General <br />4.1.1 When adding field composition mix (brickdust) to any City of Santa Ana ball field, the specific type of <br />material to be used is: Pro Gold Infield Mix with stabilizer from Gail Materials (951) 279-1095. <br />4.2 Pitchers Mound/Home Plate/Basepath Areas <br />When adding a mix with a higher clay composition material to any pitcher's mound/home plate/base-path <br />area, the specific type of material to be used is: Hill Topper Home Plate and Mound Mix. <br />5.0 Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation the following <br />equipment. <br />5.1 Utility Vehicle <br />Small tight tum radios (13') vehicle designed especially for this type of work. This vehicle shall have the <br />capability to make circle and figure eight patterns completely within the skinned brickdust infield area and <br />