My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARINA LANDSCAPE, INC. - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
MARINA LANDSCAPE, INC. - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 11:53:21 AM
Creation date
7/7/2011 8:54:21 AM
Metadata
Fields
Template:
Contracts
Company Name
MARINA LANDSCAPE, INC.
Contract #
A-2011-150
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/6/2011
Expiration Date
6/30/2012
Insurance Exp Date
8/1/2013
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in -field boundaries with a string line or suitable method and re -sod up to the border to remedy the <br />situation at contractors expense. Pre-existing conditions shall be corrected during contract start-up. <br />7.6 Final Waterine <br />7.6.1 This is the most time consuming and a very important element of the procedure <br />7.6.2 The contractor shall final water the skinned brickdust to a depth of 1/4" minimum. <br />8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order listed, shall be <br />adhered to: <br />8. 1.1 Remove all standing water from low spots either by skimming off excess water and spreading it out <br />to dry areas or using a pump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials from stock to all Wet <br />Areas and Rake Out. <br />9.0 Work to be Completed `BI -MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up amounts of <br />materials at high spots and cut and level drag the scarified material to low spots. The Contractor shall fill <br />any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and make <br />level. <br />Note: Staff shall identify areas to scarify/cut and level drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a %" min. depth and allow settling in before play on field. <br />Note: Due to heavy watering and its need to settle before play, staff shall provide a schedule of bi-monthly <br />scarify/cut and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the City's Annual Sports <br />Turf Renovation Schedule. Fields renovated may change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify drag built up amounts of <br />materials at high spots and cut and level drag the scarified material to low spots. The Contractor <br />shall fill any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust <br />from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at the November meeting with <br />contractor's owner (as per section 6.3 of contract). <br />10. 1.2 Contractor shall verify all base distances, pitching rubber distances and pitching mound heights per <br />the Little League, Pony/Colt League specifications for each specific field. Contractor shall repair <br />any specifications not being met on any field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.