My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DIXIE DIESEL AND ELECTRIC INC. 1B -2010
Clerk
>
Contracts / Agreements
>
D
>
DIXIE DIESEL AND ELECTRIC INC. 1B -2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 10:09:20 AM
Creation date
7/7/2011 4:06:50 PM
Metadata
Fields
Template:
Contracts
Company Name
DIXIE DIESEL AND ELECTRIC INC.
Contract #
A-2010-196
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/18/2010
Expiration Date
9/30/2011
Destruction Year
2016
Notes
A-2008-277; 01;
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />Specifications for Emergency Generators Preventive Maintenance <br />8. Check engine mount for proper torque. <br />BELTS AND HOSES <br />1. Inspect/replace worn accessory drive and alternator belts. <br />2. Replace cracked, leaking, or soft hoses, tighten loose clamps. <br />FAN nUIVF. <br />1. Lubricate bearings. <br />2. Lubricate belt tightener, grease fittings. <br />AIR SYSTEM <br />1. Replace element. <br />2. Check hoses and ducting for leaks. <br />BATTERIES <br />1. Tighten battery retainers. <br />2. Check electrolyte levels, add distilled water as needed. <br />3. Clean battery's exterior and terminals. <br />4. Check battery charger for proper charge rate. <br />GENERATOR <br />1. Check generator main stator windings. <br />2. Clean exterior of generator unit and the voltage regulator. <br />3. Lubricate generator front and rear bearings. <br />4. Check main stator winding temperature (if equipped). <br />5. Check bearing bracket temperature (if equipped). <br />6. Complete insulation test (megger). <br />7. Lube bearings. <br />8. Clean intake screens. <br />9. Complete a two-hour load test based upon Kohler mandated parameters for this unit. <br />TRANSFER SYSTEM FOR ALL GENERATORS <br />1. Test with approval of Building Maintenance Superintendent that electrical transfer switches <br />are working properly. (PMA's required) <br />2. Transfer load from Edison to emergency generator. <br />16 of 26
The URL can be used to link to this page
Your browser does not support the video tag.