Laserfiche WebLink
ti <br />.Specifications for Emergency Generato4oreventive Maintenance <br />LOCATION ANNUAL SEMI-ANNUAL ELECTRICAL <br />COMPREHENSIVE PREVENTIVE LOAD TEST <br />(1.)M-3jor visit (1)Semi Visit <br />Santa Ana Police Dept <br />TOTAL ANNUAL <br />PRICE <br />(1)year $COE <br />Caterpillar Standby Generator #1 $ I n c l u rl e d $1,977.45 x2 $ 1 .25o. o0 $-g3,227.45 <br />Caterpillar Standby Generator #2 $ Included $ 7, 9 7 7.4 5 x 2 S? ,. 2 rin_ o n $ 3, ??:7 4" <br />Caterpillar Diesel Fire Pump $ Included $931.96 x2 $ None $ g31 -49 <br />Santa Ana Corporate Yard <br />Kohler Standby 400KVA Generator $ Included $ 1 . 146 . --i2 x2 $ 8 n o _ nn $-1,746.52 <br />_ <br />MQ Power Diesel 220KVA Generator. $ Included $1 , 14 8_ g n x 2 $ r, 0 0 i nc>- $L, 7 4 8_ A n <br />Santa Ana City Hall <br />Kohler Standby 6bbKVA Generator <br />Santa Ana Fire Stations <br />-$ --Included $ 1 .425.00x2 $ 750,lnn $9.,1:15 on <br />Station 1 Olympian Diesel $ Included $1,056. 10 x2 6 0 -no $j1,656.10 <br />_ <br />Station 2 Genrac 2000 Diesel $ Included 818 , 17 x2 $ 6 nn. nn $ 3'14J2-];E <br />Station 3 MQ PovVer Diesel $ Included $817.30 x2 $600-00 $ --1 41-7 _-?n <br />Station 4 Onan Diesel $ T n n 1 lirl n d $ 81 -4- 6 3 x 2 $ 6 n n n() $ 1, 413 63 <br />Station 5 Caterpillar Diesel $ T n-1 li d P ri $ 4 g n or, x2 $ 6 n n_ Do _ $ 1, R 9 0 Or, <br />_ <br />Train Station Included 820.85 $ 600.00 $ 1,420.85 <br />21 of 22 <br /> <br />