My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:24:27 PM
Creation date
7/19/2011 1:32:08 PM
Metadata
Fields
Template:
Contracts
Company Name
ICF INTERNATIONAL
Contract #
A-2011-136
Agency
PLANNING & BUILDING
Council Approval Date
5/16/2011
Insurance Exp Date
6/25/2013
Destruction Year
2017
Notes
UC on agmt exp date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Consulting Services (aoo East First American Way) I City of Santa Ana <br />■ Attendance atone site visit (assumes up to four team members), including drive time and preparation. <br />■ Draft and final project description and objectives (assumes one round of review and revision) <br />■ Memo documenting information requests. <br />Task 2. Prepare Technical Studies <br />Due to the nature and location of the proposed project it is anticipated that the following technical studies will be required: <br />■ Traffic Impact Analysis <br />■ Air Quality Impact and Greenhouse Gas Analysis <br />■ Noise Impact Study <br />■ Cultural Resources Study <br />It is anticipated that the applicant would provide a preliminary level of site specific technical analysis including: preliminary <br />site plan, grading plans, a preliminary geotechnical study, and a water quality management plan. <br />'r,0i4: HAI Provid:,d i',y U.6 <br />The following tasks are included in preparation of a project specific TIA, which will be summarized in the IS/MND and <br />included as an Appendix. <br />TIA Task 1: Project Mobilization <br />■ LLG will confirm the project description, work schedule, and assumptions to be utilized in the TIA. This will include the <br />assumptions to be used for the project completion year and anticipated phasing, if any. LLG would need to obtain a <br />current project site plan that illustrates the access scheme to the project site in both hard copy and digital formats. <br />■ LLG will work with City staff to discuss the project and analysis criteria, confirm the study approach, identify pertinent <br />traffic issues and concerns, and formalize the Scope of Work for the TIA, which will be submitted to the City for review <br />and approval. <br />TIA Task 2: Data Collection and Research <br />■ Visit the project study area to confirm existing conditions with respect to existing site development, local area <br />development, site access, parking use, and areas of congestion in order to verify our overall understanding of traffic <br />conditions in the area that might affect this project. <br />■ Document the existing roadway striping, traffic control measures, curbside parking restrictions, adjacent intersection <br />configurations, and other pertinent roadway features. <br />■ Obtain existing street improvement plans/striping plans for key roadways in the immediate vicinity of the project site. <br />Compile information with regards to planned street improvements in the project study area. <br />■ Conduct AM peak period and PM peak period traffic volume counts at up to fifteen (15) study intersections. The traffic <br />counts will be conducted between the hours of Too AM and 9:0o AM and 4:00 PM and 6:0o PM. These traffic volume <br />data will be utilized in the traffic impact analysis for the project. The number and location of the study intersections <br />will be verified with City staff prior to commencement of the analysis. Should traffic and analysis of additional <br />intersections be required (i.e., more than i5 intersections), an amendment to the TIA scope and budget will be <br />necessary. <br />■ Conduct 24-hour machine traffic counts at up to fifteen (15) roadway segments to support the Greenhouse Gas, Air <br />Quality and Noise analyses. <br />■ Research data at the City of Santa Ana, adjacent jurisdictions and recent traffic impact studies prepared for <br />developments in the project vicinity regarding the status of other proposed developments (related projects) in the <br />area that may contribute cumulative impacts to the adjacent street system and study locations in the vicinity of the <br />proposed project. The compiled list of related projects will be forwarded for review and approval by City staff. <br />■ Obtain development information for the remaining vacant portion of the 3-acre parcel to include as a related project in <br />the cumulative traffic setting. <br />Use or disclosure of data contained on this sheet is subject <br />to the restriction on the title page of this proposal. <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.