My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:24:27 PM
Creation date
7/19/2011 1:32:08 PM
Metadata
Fields
Template:
Contracts
Company Name
ICF INTERNATIONAL
Contract #
A-2011-136
Agency
PLANNING & BUILDING
Council Approval Date
5/16/2011
Insurance Exp Date
6/25/2013
Destruction Year
2017
Notes
UC on agmt exp date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Consulting Services (too East First American Way) I City of Santa Ana <br />require improvements to mitigate potential traffic impacts associated with the proposed project to less than <br />significant levels. <br />■ Provide recommended mitigation measures which may include intersection and/or signalization improvements, <br />striping modifications, the addition of auxiliary turn lanes, traffic control/limitations at site access points, etc. Please <br />note that this proposal assumes the recommended mitigation measures can be adequately described within the text <br />of the report. Should the City request preparation of plans to further demonstrate the feasibility of the mitigation <br />measures, an amendment to our contract will be necessary. <br />■ Calculate the net traffic increment (fair -share percentage) due to the project at the impacted intersections. Based on <br />the required mitigation measures, estimate the project's fair -share towards the cost of the proposed mitigation <br />improvements. <br />TIA Task 6: Site Access and Circulation Review <br />■ Review the proposed site plan and provide recommendations to address City concerns regarding site access and <br />circulation. Prepare AM and PM peak hour LOS calculations at the project driveways. <br />■ Evaluate and comment on the proposed access and internal circulation scheme of the proposed project, with a focus <br />on on -site circulation layout and design, ingress and egress safety opportunities and constraints, adequate sight <br />distances at project driveways, pedestrian circulation, locations of proposed driveways with respect to existing <br />(conflicting) driveways, striping configurations, and median modifications, if any. <br />TIA Task 7: Alternative Projects Trip Generation Comparison <br />■ Prepare a qualitative trip generation comparison between the proposed project and up to four (4) project alternatives. <br />TIA Task 8: Construction Traffic Assessment <br />■ Prepare a qualitative construction traffic assessment for the proposed project to include a trip generation analysis and <br />a construction traffic management plan. Trip generation forecasts will be developed for the following construction <br />activities: i) demolition, 2) site preparation, and/or 3) building construction. In order to forecast the potential <br />construction related trips associated with the construction activities at the project site, the hours of operation, <br />duration, number of truck trips and employees at the site will be needed. <br />TIA Task 9: Preparation of the TIA <br />■ Prepare a Screencheck TIA that details all of the above -mentioned items including our analysis, findings and <br />conclusions. The Screencheck TIA will be suitably documented with tabular, graphic and appendix material. The <br />report will be submitted for screen -check review by the appropriate members of the project team and the City. <br />■ If necessary, revise the Screencheck report based on project team and City comments and submit a Draft TIA for <br />inclusion into the Draft IS/MND. The Draft TIA will be suitably documented with all tabular, graphic and appendix <br />materials. <br />The completed technical report will be provided as an Appendix to the IS/MND and summarized in the traffic section of the <br />IS/MND. <br />If the technical report analysis indicates that the project would result in a significant impact related to traffic after <br />implementation of feasible mitigation measures and project design changes, we would alert the City to the fact that an EIR <br />would need to be prepared, and would provide the appropriate scope of work and budget. <br />Air Quahily Imp rya aril G eenhouse Gas Analysis <br />An air quality impact and greenhouse gas technical analysis will be prepared consistent with the technical requirements <br />and methodologies outlined in the South Coast Air Quality Management District's (SCAQMD) CEQA AirQuality Handbook <br />(as updated per the revisions posted on the SCAQMD website), Localized Significance Threshold MethodologyforCEQA <br />Evaluations, and Particulate Matter(PM) 2.5 Significance Thresholds and Calculation Methodology guidance documents. <br />Climate change/GHG emissions, specific methodologies and thresholds will be developed based on information provided <br />in the California Air Resources Board (CARB) publication Local Government Operations Protocol for the Quantification and <br />Reporting of Greenhouse Gas Emissions Inventories and consultations with City and SCAQMD staff members. The air quality <br />assessment will consist of the following: <br />Use or disclosure of data contained on this sheet is subject <br />to the restriction on the title page of this proposal. <br />to Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.