My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01 - JOINT DDA Crevier and Mini at SA Auto Mall - Resolution - color
Clerk
>
Agenda Packets / Staff Reports
>
Successor Agency (Formerly the Community Redevelopment Agency) (1974-Present)
>
COMMUNITY REDEVLOPMENT AGENCY(1974-2012)
>
2010-2012
>
2011
>
06/22/2011
>
01 - JOINT DDA Crevier and Mini at SA Auto Mall - Resolution - color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:32:17 PM
Creation date
7/20/2011 12:15:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
01
Date
6/22/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br />REVISED SCOPE OF DEVELOPMENT AND SCHEDULE <br />It is recognized that certain requirements specified in the original Scope of Development and <br />General Conditions attached to the Private Disposition and Development Agreement as of July <br />19, 2004, have been completed or complied with. The only remaining requirements are as <br />follows: <br />Project Description <br />The portion of the Property shown within the larger hash-lined area on the aerial photograph <br />attached hereto, comprised of approximately 111,035 square feet, shall be improved pursuant to <br />SD (Specific Development District) 60 standards, state, county and municipal codes and other <br />applicable construction requirements. The portion of the Property shown within the cross hashed <br />area on the aerial photograph attached hereto, comprised of approximately 54,114 square feet, <br />shall be improved by raising the existing grade of such area to create a surface level with the <br />remainder of the Property within the larger hash-lined area. This grading shall be accomplished <br />to provide sufficient drainage and shall be performed in accordance with all state, county and <br />municipal codes and other applicable construction requirements, including, but not limited to, <br />requirements of the City of Santa Ana's National Pollution Discharge Elimination System <br />permit. The concrete at the driveway located at the northwest most portion of the Property shall <br />be repaired. Construction of such improvements shall be completed by July 1, 2016. The <br />Developer shall secure all applicable approvals and permits. <br />Refuse <br />An enclosed refuse area or areas shall be provided at locations in accordance with the <br />requirements of the City of Santa Ana. Refuse areas shall be designed with building materials <br />compatible with those used for the other structures on the site. <br />S_ig_ns <br />All signage on the Site shall be only that which is permitted by the City of Santa Ana pursuant <br />the applicable zoning under SD-60 and subject to approval of Agency's Executive Director. <br />Utilities <br />The Developer shall be responsible for all utility relocation or installations on the Property; and <br />hookups to sewers, drains, water and gas distribution lines, electric, telephone and telegraph <br />lines; and for hookup to all other public utility lines. All utility services on-site shall be installed <br />underground or concealed within buildings and no mechanical equipment or meters shall be <br />exposed at ground level as required by the Santa Ana Municipal Code. <br />1-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.