My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RFP - SURVEYING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/01/2011
>
19F - RFP - SURVEYING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:42:01 PM
Creation date
7/28/2011 10:52:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19F
Date
8/1/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br />REQUEST FOR PROPOSALS FOR <br />AS-NEEDED SURVEYING SERVICES <br />Scope of Work: <br />1. Research County and City records for survey monuments within the project area <br />2. Prior to any clearing, removal, or excavation efforts, perform a diligent search for <br />property line monuments, street centerline monuments, and benchmarks within the <br />project area, recording their identities and precise locations in reference to <br />monuments or witness monuments that will not be disturbed during construction. <br />The records of these monuments and references shall conform to Section 8771 of <br />the Business and Professions Code of the State of California. After completion of <br />the construction, any monument disturbed or removed during construction shall be <br />reset, conforming to Section 8771. Each centerline intersection shall be drawn on a <br />single Corner Record showing local tie points and tie distances. A copy of all these <br />records shall be provided to the City. <br />3. Provide construction staking for project improvements. Records of the line and <br />grade stakes (cut sheets) shall be on forms provided by the City, and the originals <br />shall become the property of the City upon completion of each survey request. <br />4. Set line and grade stakes in accordance with the plans and specifications. Notify the <br />City immediately of any discrepancies or design errors discovered on the plans <br />during staking or when verifying the line and grade of existing improvements at join <br />points. <br />5. Complete the construction staking within two working days from the receipt of the <br />survey request, or (when more than two working days notice is provided) within the <br />time frame specified on the Survey Request. <br />6. Furnish all office support, labor, materials, equipment, tools, and incidentals <br />necessary to complete the specified surveys. The costs for these items shall be <br />included in the hourly rates and no additional compensation will be allowed <br />therefore. <br />Exhibit 1 <br />19F-3
The URL can be used to link to this page
Your browser does not support the video tag.