Laserfiche WebLink
<br /> <br /> <br /> <br /> ABSTRACT OF BID <br /> CONTRACT AWARD FOR UNINTERRUPTIBLE POWER SUPPLY REPLACEMENT (11-033) <br /> <br /> <br /> OFFERS ARE MGE UPS SYSEMS THAT MEET BID SPECS. <br /> <br /> Based on the recommendations made in the offers received, one transformer was added to the project, after the bids <br /> were opened. Purchasing requested the 2 best offers received to add the cost of the transformer. <br /> <br /> ALL REVISED OFFERS PRESENTED WITH SALES TAX AT 7.75% REFLECTING TAX RATE CHANGE AS OF 7-1-11 <br /> <br /> POWER SYSTEMS INNOVATIONS - ORLANDO FL $65,496.73 + 3% CONTINGNECY = $67,400.00 = AwAR <br /> POWER SYSTEMS ENGINEERING - CRESTWOOD IL $69,141.77 <br /> <br /> <br /> ALL ORIGINAL OFFERS PRESENTED WITH SALES TAX AT 8.75% <br /> VENDOR - LOCATION <br /> <br /> POWER SYSTEMS INNOVATIONS - ORLANDO FL $59,647.73 <br /> POWER SYSTEMS ENGINEERING - CRESTWOOD IL $60,114.83 <br /> TIM POWER SYSTEMS - TORRANCE CA $76,332.70 <br /> TITAN POWER INC - PHOENIX AZ $77,059.50 <br /> <br /> ALTERNATIVE MANUFACTURER OFFERS <br /> <br /> ALL OFFERS PRESENTED WITH SALES TAX AT 8.75% <br /> <br /> VENDOR - LOCATION <br /> POWER CONVERSION SYSTEMS - HUNTINGTON BEACH CA $61,966.84 <br /> LIEBERT MFG <br /> POWER CONVERSION SYSTEMS - ALTERNATIVE OFFER 2 $67,593.56 <br /> LIEBERT MFG. <br /> POWER CONVERSION SYSTEMS - ALTERNATIVE OFFER 3 $69,064.95 <br /> LIEBERT MFG. <br /> TITAN POWER - PHOENIX AZ $72,336.56 <br /> LIEBERT MFG. <br /> TITAN POWER - ALTERNATIVE OFFER 2 $76,315.40 <br /> GAMATRONIC MFG. <br /> <br /> <br /> <br /> AWARD TO: POWER & SYSTEMS INNOVATIONS <br /> <br /> $67,400 <br /> <br /> Exhibit 1 <br /> <br /> <br /> <br /> <br /> 22C-3 <br />