Laserfiche WebLink
ABSTRACT OF BID <br />CONTRACT AWARD FOR UNINTERRUPTIBLE POWER SUPPLY REPLACEMENT (11 -033 <br />OFFERS ARE MGE UPS SYSEMS THAT MEET BID SPECS. <br />Based on the recommendations made in the offers received, one transformer was added to the project, after the bids <br />were opened. Purchasing requested the 2 best offers received to add the cost of the transformer. <br />ALL REVISED OFFERS PRESENTED WITH SALES TAX AT 7.75% REFLECTING TAX RATE CHANGE AS OF 7 -1 -11 <br />POWER SYSTEMS INNOVATIONS — ORLANDO FL $65,496.73 + 3% CONTINGNECY = 1$67,400.00 = AwAR <br />POWER SYSTEMS ENGINEERING — CRESTWOOD IL $69,141.77 <br />ALL ORIGINAL OFFERS PRESENTED WITH SALES TAX AT 8.75% <br />VENDOR — LOCATION <br />POWER SYSTEMS INNOVATIONS — ORLANDO FL <br />POWER SYSTEMS ENGINEERING — CRESTWOOD IL <br />TIM POWER SYSTEMS — TORRANCE CA <br />TITAN POWER INC — PHOENIX AZ <br />ALTERNATIVE MANUFACTURER OFFERS <br />ALL OFFERS PRESENTED WITH SALES TAX AT 8.75% <br />VENDOR - LOCATION <br />POWER CONVERSION SYSTEMS — HUNTINGTON BEACH CA <br />LIEBERT MFG <br />POWER CONVERSION SYSTEMS - ALTERNATIVE OFFER 2 <br />LIEBERT MFG. <br />POWER CONVERSION SYSTEMS — ALTERNATIVE OFFER 3 <br />LIEBERT MFG. <br />TITAN POWER — PHOENIX AZ <br />LIEBERT MFG. <br />TITAN POWER — ALTERNATIVE OFFER 2 <br />GAMATRONIC MFG. <br />AWARD TO: POWER & SYSTEMS INNOVATIONS <br />$67,400 <br />Exhibit 1 <br />22C -3 <br />$59,647.73 <br />$60,114.83 <br />$76,332.70 <br />$77,059.50 <br />$61,966.84 <br />$67,593.56 <br />$69,064.95 <br />$72,336.56 <br />$76,315.40 <br />