My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - LED STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/24/2011
>
25F - AGMT - LED STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:41:27 PM
Creation date
8/16/2011 11:39:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
8/24/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. UTILITIES <br />Contractor shall immediately report any damage to utility lines that occurs shall immediately <br />report to the utility company that is involved. The cost of repair, if required, will be at the <br />Contractor's expense. If damage occurs to any adjacent shrubs or trees that are to remain on the <br />site, immediate treatment or necessary replacements of the same shall be at the Contractor's <br />expense. <br />22. ACCESS TO PRIVATE PROPERTY <br />Prior to the commencement of any work that will restrict access to private property the Contractor shall <br />notify each affected property owner or responsible person, informing him or her of the nature of and the <br />approximate duration of the restriction. <br />23. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />The Contractor shall be responsible for the protection of all improvements adjacent to the work, such as <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, wall, sidewalks, street <br />paving, etc., located on either public or private property. If any improvements are damaged they shall be <br />replaced in kind at the Contractor's expense. <br />24. TRAFFIC CONTROL <br />The Contractor shall conduct all work in a manner that will insure continuous traffic flow on the street at <br />all times. In situations where it is necessary to restrict traffic flow per WATCH, the Contractor will <br />contact the Director for approval. <br />25. MISCELLANEOUS TRAFFIC DEVICES <br />Contractor shall provide all traffic control and miscellaneous traffic devices as may be required for <br />routine and/or extraordinary maintenance perform pursuant to this Agreement. <br />Signs used for handling traffic during the course of this contract shall be in accordance with the WATCH <br />published by Building News, Inc., and made a part of these special provisions. The method in which <br />signs, barriers and other miscellaneous traffic devices are used during construction and/or repair shall be <br />in accordance with the publication mentioned. A copy of said publication is on file in the Santa Ana <br />Public Works Agency - Administration Division. <br />All signs shall be illuminated or reflectorized when they are used during hours of darkness. All cones, <br />pylons, barricades, or posts used in the diversion of traffic shall be provided with flashers, or other <br />satisfactory illumination if in place during hours of darkness. <br />26. WORK BY CITY FORCES BECAUSE OF NONCONFORMANCE TO CONTRACT <br />Should the Contractor fail to correct deficiencies or public nuisances that have been created because of its <br />operation, then such deficiency or public nuisance will be considered to be of an emergency nature and cause <br />the City to make corrective work. Such work will be done on a force account basis with an additional callout <br />charge of Two Hundred Dollars ($200.00) for each callout. <br />7 <br />25F-11
The URL can be used to link to this page
Your browser does not support the video tag.