Laserfiche WebLink
7. Recycling <br />All waste (including construction and demolition materials) resulting from work <br />performed under this contract shall be recycled. The Contractor will be responsible for <br />the disposal of all nonrecyclable waste in accordance with all applicable local, State and <br />federal laws and regulations. A recycling and disposal plan must be submitted for <br />approval prior to start of work. <br />8. General Maintenance and Clean-Up <br />All trash and debris shall be removed from all worksites at the end of each day. The <br />Contractor shall keep sidewalks and all paved areas in parkway swept and cleaned of any <br />debris, dirt, or soil. <br />9. Emergency Service <br />The Contractor shall be able to receive and respond to the City's call for emergency <br />service twenty-four (24) hours per day, seven (7) days per week. Response time shall be <br />immediate but not more than two (2) hours to remove or eliminate a public safety hazard. <br />Contractor shall provide the City with a local telephone number where Contractor can be <br />contacted twenty-four (24) hours per day, seven (7) days per week. <br />PART III. SPECIAL PROVISIONS <br />Contractor shall remove and dispose of the existing street light luminaries attached to the 253 <br />street light poles marked on Exhibit A, attached hereto. Then Contractor shall replace those <br />luminaries with 253 Leotek modet #GCl-80E-MV-NW-3-GY-350 LED street light luminaries. <br />Said replacement luminaries shall be provided at Contractor's expense. <br />12 <br />25F-19