My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - STREET LIGHT POLE REPAINTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/24/2011
>
25G - AGMT - STREET LIGHT POLE REPAINTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:55:30 PM
Creation date
8/16/2011 11:40:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
8/24/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATCH, the Contractor will contact the Director for approval. <br />Contractor shall provide all traffic control and miscellaneous traffic devices as may be <br />required for routine and /or extraordinary maintenance of this contract. <br />Signs, barriers and other traffic control devises required to maintain traffic during the <br />Project shall be in accordance with the WATCH published by Building News, Inc., and <br />made a part of these special provisions. The method in which signs, barriers and other <br />miscellaneous traffic devices are used during construction and /or repair shall comply <br />with the WATCH provisions. <br />All signs shall be illuminated or reflectorized when they are used during hours of <br />darkness. All cones, pylons, barricades, or posts used in the diversion of traffic shall be <br />provided with flashers, or other satisfactory illumination if in place during hours of <br />darkness. <br />23. WORK BY CITY FORCES DUE TO NONCONFORMANCE <br />If Contractor fails to correct deficiencies or public nuisances that have been created <br />because of his operation, then these will be considered to be of an emergency nature and cause <br />the City to move in on the project to make corrective work. Such work will be done on a force <br />account basis with an additional callout charge of Two Hundred Dollars ($200.00) for each <br />callout. <br />24. PAYMENT <br />Contractor will be paid after completion of the Project, upon approval by the <br />Agency. Contractor shall submit a detailed report of work performed and materials used in <br />the project. This report shall be accompanied by a billing in accordance with the contract <br />price for the work performed, and shall become basis for payment. <br />25. APPRENTICESHIP STANDARDS <br />Where required under law, the contractor on this project shall assume full <br />responsibility for compliance with apprenticeship standards as established by Section <br />1777.5 of the California State Labor Code. <br />26. SUBCONTRACTORS <br />Contractor shall not, without the written consent of the City: <br />a. Substitute any person or firm as subcontractor in place of the subcontractor <br />designated in the original proposal. <br />b. Permit any subcontract to be assigned or transferred or allow it to be performed <br />by anyone other than the original subcontractor listed in the proposal. <br />25G -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.