Laserfiche WebLink
Land Area Fee is calculated by multiplying the square footage of the parcel by <br />the Land Area Rate (10 cents per square foot)3 <br />Building Area Fee is calculated by multiplying the square footage of a structure, <br />as derived from its gross exterior dimensions, by the Building Area Rate (15 <br />cents per square foot). <br />Flat Parcel Fee — each individual Assessor's Parcel is assessed the Flat Parcel <br />Rate ($425). <br />Street Frontage Rate <br />Land Area Rate <br />Building Area Rate <br />Flat Parcel Rate <br />$6.00 per linear foot <br />10¢ per square foot <br />15¢ per square foot <br />$425 per parcel <br />During the term of the CMD, the annual budget and corresponding assessments <br />may be adjusted to reflect an annual cost of operations increase of five percent. <br />Since the CMD is planned for a five -year term, maximum assessments for future <br />years (years 2 -5) must be set at the inception of the CMD. While future <br />inflationary and other program cost increases are unknown at this point, a built -in <br />maximum increase of five percent per year is incorporated into the projected <br />program cost and, in turn, the resulting assessment rates for the five -year life of <br />the CMD. These figures are shown in the table below. Assessment rates may <br />not exceed those indicated below. <br />Five -Year Maximum Assessment Rates (Includes a 5 percent cap on annual <br />increases) <br />Rate <br />Year One <br />Year Two <br />Year Three <br />Year Four <br />Year Five <br />Street Frontage Fee <br />$6 <br />$6.30 <br />$6.62 <br />$6.95 <br />$7.30 <br />Land Area Fee <br />10¢ <br />10.5¢ <br />110 <br />11.6¢ <br />12.2¢ <br />Building Area Fee <br />15¢ <br />15.8¢ <br />16.6¢ <br />17.4¢ <br />18.3¢ <br />Flat Parcel Fee <br />$425 <br />$446 <br />$469 <br />$491 <br />$516 <br />Any annual budget surplus or deficit will be incorporated into the subsequent <br />year's CMD budget, and subsequent annual assessments will be set to account <br />for surpluses or deficits carried forward. <br />G. Time and Manner of Collecting Assessments <br />