Laserfiche WebLink
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />SEPTEMBER 6, 2011 <br />TITLE: <br />PUBLIC HEARING - ABANDONMENT NO. <br />10 -01: TO VACATE PORTIONS OF SANTA <br />ANA BOULEVARD BETWEEN MINTER <br />AND POINSETTIA STREETS <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1s` Reading <br />❑ Ordinance on 2nd Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />Adopt a resolution vacating portions of Santa Ana Boulevard between Minter and Poinsettia <br />Streets. <br />DISCUSSION <br />On August 1, 2011, the Council adopted a resolution declaring the city's intent to vacate portions of <br />Santa Ana Boulevard between Minter and Poinsettia Streets. <br />The Related Companies of California (Related) is working with the Community Redevelopment <br />Agency to develop courtyard housing as part of the Station District project. As part of the <br />development, Related is requesting that portions of Santa Ana Boulevard at two locations be <br />vacated. Those portions of right -of -way are unimproved strips of land situated behind the southerly <br />sidewalk of Santa Ana Boulevard. Area 1 is between Minter Street and Lacy Street, and Area 2 is <br />between Garfield Street and Poinsettia Street (Exhibit 1). Both locations are rectangular- shaped, <br />with Area 1 measuring 12 feet in width by 210 feet in length and Area 2 measuring 12 feet in width <br />by 50 feet in length. <br />The right -of -way width for Santa Ana Boulevard between Poinsettia Street and Mortimer Street <br />fluctuates between 80 feet and 92 feet. The variance is mostly due to 12- foot -wide dedications and <br />reservations made along the south side of the street. The purpose of the accumulation of right -of- <br />way was to provide for future widening of the street. However, the street has not experienced the <br />anticipated additional traffic and is not expected to experience the traffic volumes to justify the <br />widening. With the vacation, the street right -of -way width will measure 80 feet and will align with <br />adjacent segments of the street. The street curbs will remain in place. <br />Additionally, this segment of Santa Ana Boulevard is being studied as a potential route for the fixed <br />guideway transit system. The right -of -way being vacated is not needed for the transit system. <br />The areas to be vacated will be incorporated into the adjacent Station District project. The <br />additional land area reduces the site's constraints and improves overall site function, such as <br />setbacks, building locations, and site accessibility. <br />75B -1 <br />