Laserfiche WebLink
AGREEMENT NO. C-1-2630 <br />EXHIBIT C <br />M EXHIBIT C: TE FINAL PROJECT REPORT FORM <br />OCTA Date <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Agency <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br /> <br /> <br /> <br />Phase <br />Engineering <br /> <br />$ <br /> <br /> <br />$ <br /> <br /> <br />$ - <br /> <br />J7f-,%a1t <br />$ - Other <br />OGTA , <br />Fri"n'oin <br />$ - <br /> <br />Total' <br />$ - <br />Right-of-Way $ - $ - $ - $ - $ - $ - <br />Construction $ - $ - $ - $ - $ - $ - <br />Total $ - $ - $ - $ - $ - $ <br />Prniart Srharlula <br />Rate, <br />0% <br />Phase Proposed Actuaf.. - <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Right-of-Way Certification <br />Read to Advertise <br />Award Construction <br />Project Completion (open for use <br />Page 1 <br />20A-16