My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE (3) - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PLANNING CENTER, THE (3) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:23:59 PM
Creation date
9/20/2011 9:11:57 AM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2011-199
Agency
PLANNING & BUILDING
Council Approval Date
8/24/2011
Insurance Exp Date
7/1/2013
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Center ( DC &E will Identify issues relative to both sites including safety, utility points of connection, drainage <br />patterns and infrastructure. The memorandum will include a diagram that will Identify circulation patterns, <br />adjacent properties, existing vegetation, views to and from the site, and locations for potential buildings. The <br />memorandum will be submitted to City /District staff for review and comment. <br />Program Analysis <br />The Planning Center j DC &E will utilize the City of Santa Ana General Plan and the Youth & Family Master Plan <br />Assessment Phase I as base documents to assess the recreational needs In the community. The team will gather <br />and review the most current population data from US Census, SCAG, the City Planning Department, and State <br />Finance Department to identify changing demographic trends that will impact local park and recreation <br />planning. Additionally, the team will research recreation patterns and trend information through resources such <br />as American Demographics, institute of"the Future, CPRS; NRPA, the State of California Park and Recreation <br />Depart ment Needs Survey (2008), the CPRS Action Plan, Outdoor Industry Association Surveys, California Arts <br />Council and others to identify changing recreation patterns that are pertinent to program development for the <br />park site. City staff will provide survey results from the 2010 OCCCO Park Planning Committee future Pacific <br />Electric Park Site Survey along with other data and information associated to date with the planning for the <br />Pacific Electric Park Site. <br />Alternative Concepts <br />The Planning Center ( DC &E will produce up to three alternative concepts for Centennial Park based on the site <br />analysis, program research and discussions with City /District staff. The Planning Center ( DC &E will produce up <br />to two alternative concepts for the proposed site based on the site analysis, program research and discussions <br />with City /District staff, the conceptual plan for Pacific Electric Park will be the third alternative. The alternatives <br />will identify which program elements determined in an earlier task can be accommodated at the park site. <br />Preliminarily, It is anticipated that these alternatives may include, but not be limited to: <br />• Paths and neighborhood connections <br />• Benches and seating <br />• Restroom <br />• Shaded or covered areas <br />• Picnic and barbeque sites <br />• Tot and school -aged play areas <br />• Informal turf areas <br />• Fencing <br />• Amphitheater <br />• Interpretive signage <br />• Exercise stations <br />• Plantings <br />• Shade structures <br />• Play fields, space permitting — baseball, softball, soccer, multi -use <br />• Basketball, tennis, bocce, horseshoes or other play courts <br />• Water play areas <br />• Community gardens <br />PLANNING IS THINKING AND DOING SOMETHiNG ABOUT THE FUTURE NOW. LET'S COLLABORATE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.