My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 5 (2) - 2011
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 5 (2) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2014 5:07:48 PM
Creation date
9/26/2011 10:32:51 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2011-198
Agency
Planning & Building
Council Approval Date
8/24/2011
Insurance Exp Date
4/30/2015
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following technical studies will also be completed: <br />• Traffic <br />• Air Quality /GHG <br />• Noise <br />• Cultural Resources <br />• Hydrology, Water and Sewer Systems, and Utilities <br />The air quality and greenhouse gas (GHG) emissions analysis will evaluate potential <br />citywide emission reductions from implementation of policies and circulation <br />Improvements. The analysis will be based on an estimate of future VMT provided by <br />the traffic analysis with and without the proposed project and compared to existing <br />condition. Since it is anticipated that air quality and GHG emissions will benefit by the <br />Implementation of the City's updated Circulation Element, no significant long -term <br />impacts are anticipated. The noise analysis will address changes in the ambient <br />noise from existing conditions and at the horizon year with and without <br />implementation of the updated Circulation Element. Increases in traffic noise levels <br />will be modeled using the FHA Highway Prediction Noise Model. Because <br />Implementation of the project would not generate trips, no significant impacts are <br />anticipated. <br />This proposal assumes that tribal consultations for the General Plan update in <br />accordance with SB 18 will be conducted by the City. All CEQA notices will be <br />forwarded to the Native American Heritage Commission (NAHC) and The Planning <br />Center will assist with the consultation on a time and materials basis if requested by <br />the City. <br />TASK 9: PREPARE UPDATED CIRCULATION <br />ELEMENT <br />Objective: To prepare an updated Circulation Element ready to be integrated into <br />the General Plan, with policies, goals, and objectives that reflect the requirements of <br />the Complete Streets Act and the Ideas and projects identified in the circulation, <br />transit, bicycle and pedestrian planning efforts completed in this project. <br />Key Issues: The final Circulation Element must appropriately reflect the technical <br />work efforts, planning process, community outreach efforts, and policy development <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.