Laserfiche WebLink
1.03 EQUIPMENT <br />The Contractor shall perform all work necessary to complete the provisions of this <br />contract in a satisfactory manner unless otherwise provided. The Contractor shall furnish <br />all equipment, tools, materials, supplies and labor necessary to complete the work. It is <br />mandatory that the following equipment and tools be provided. <br />a.) Minimum half (1/2) I.) Push brooms <br /> cubic yard loader <br />b.) Minimum twenty (20) m.) Loppers <br /> cubic yard dump <br /> truck <br />c.) Gas-powered n.) Tree pole saw <br /> lawnmower <br />d.) Gas-powered weed o.) Hedge shears <br /> eater <br />e.) Gas-powered P.) Long handled hoe <br /> blower <br />f.) Gas-powered q.) Pitch fork <br /> hedge trimmer <br />g.) Gas-powered chain r.) Traffic cones or <br /> saw delineators <br />h.) Edger S.) Wheelbarrow <br />i.) Shovel t.) Tractor <br />0 Scoop shovel u.) Discer <br />k.) Rakes <br />25C-15