Laserfiche WebLink
1.03 EQUIPMENT <br />The Contractor shall perform all work necessary to complete the provisions of this <br />contract in a satisfactory manner unless otherwise provided. The Contractor shall furnish <br />all equipment, tools, materials, supplies and labor necessary to complete the work. It is <br />mandatory that the following equipment and tools be provided. <br />a.) <br />Minimum half (1/2) <br />I.) <br />Push brooms <br />cubic yard loader <br />b.) <br />Minimum twenty (20) <br />m.) <br />Loppers <br />cubic yard dump <br />truck <br />C.) <br />Gas - powered <br />n.) <br />Tree pole saw <br />lawnmower <br />d.) <br />Gas - powered weed <br />o.) <br />Hedge shears <br />eater <br />e.) <br />Gas - powered <br />p.) <br />Long handled hoe <br />blower <br />f.) <br />Gas - powered <br />q.) <br />Pitch fork <br />hedge trimmer <br />g.) <br />Gas - powered chain <br />r.) <br />Traffic cones or <br />saw <br />delineators <br />h.) <br />Edger <br />s.) <br />Wheelbarrow <br />i.) <br />Shovel <br />t.) <br />Tractor <br />0 <br />Scoop shovel <br />u.) <br />Discer <br />k.) <br />Rakes <br />25C -15 <br />