My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STL LANDSCAPE, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
STL LANDSCAPE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:13:27 PM
Creation date
10/4/2011 2:13:07 PM
Metadata
Fields
Template:
Contracts
Company Name
STL LANDSCAPE, INC.
Contract #
08-6019
Agency
Public Works
Council Approval Date
10/3/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award for MoFadtlen Triangle Habitat Restoration <br />October 3, 2011 <br />Page 2 <br />Santa Ana Conhacfors receiving notices: 19 <br />Contractors requesting bidding documents: i f <br />Bids received. 7 <br />Bids received from Santa Ana Contractors: 0 <br />While the City made outreach efforts to Santa Ana contractors regarding the notice inviting bids, no <br />contractors from Santa Rna submitted bids. A survey was taken from randomly selected Santa <br />Ana contractors who chose not to bid The results indicated That They either were not capable of <br />performing this type of work, were unable to obtain insurance because the project was too large, or <br />They worked as a suhcontmctor to certain prime contracers. <br />The bids received are as follows. <br />NAME OF RESPONSIVE BIDDER CITY BASE BID AMOUNT <br /> <br />1. STL Landscape Los Angeles $ 80,000.00 <br />2. AramexxConshucfion Chino $ 83,575.00 <br />3. HYM Engineering Buena Park $84,050.00 <br />4. NativeLandscapelnc. Escondido $ 91,880.00 <br />5. Marina Landscape, Inc. Anaheim $112,700.00 <br />6. Mlcon Construction Placentia $123,94720 <br />1. Fleming Environmental Fulledan $126,935.00 <br />A total of seven bids were received and all were responsive. The lowest bid was submlded by STL <br />Landscape (or $80,000, which Is below the Engineer's estimate of $115,515. The bidding <br />documents require that the Icwes( responsible bidder be selected based on the lowest base bid. <br />The amount to be awarded will Include the base hid plus add•on Alternate Two in the total amount <br />of $111,500. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Acf, the recommended action is exempt <br />from fudher review. Categorical Exemption Environmental Review No. 2006167 was (fled for Phis <br />project.
The URL can be used to link to this page
Your browser does not support the video tag.