My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - NPDES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
10/17/2011
>
19E - RFP - NPDES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:39:02 PM
Creation date
10/13/2011 2:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
10/17/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall also include the proper implementation of traffic control measures <br />which adhere to the Work Area Traffic Control (WATCH) handbook or <br />approved traffic control required to divert traffic around maintenance <br />equipment. The City of Santa Ana has 1657 catch basins within the City and <br />the average catch basin opening is 10.5 feet. <br />(2) Cost per drainage culvert cleaned. Cost shall include all costs required to <br />remove, transport and dispose of all debris in a proper disposal facility. Cost <br />shall also include the proper implementation of traffic control measures <br />which adhere to the Work Area Traffic Control (WATCH) handbook or <br />approved traffic control required to divert traffic around maintenance <br />equipment. The City of Santa Ana has approximately 1600 drainage culverts <br />within the City. Unit length of 25 foot of culvert will be used for bid cost <br />purposes. Final pay will be base on actual length of culvert cleaned adjusted <br />proportionally. <br />F. Proposal submittal and signature. Five (3) copies of your proposal shall be signed <br />by a company official with the power to bind the company in its proposal. All <br />proposals must be completely responsive to the RFP. <br />III. SCOPE OF WORK <br />Drainage Facility Inspection & Cleaning <br />Contractor shall: <br />Commence inspection and cleaning of drainage facilities after proper execution of <br />contract agreement. The City of Santa Ana has 1657 catch basins within the City, see <br />attached Citywide map of catch basin locations(Attachemt D). Consultant shall clean all <br />drainage facilities and be called upon on an as needed basis. A maximum 3 hour <br />response time to request for cleaning will be required. Individual grid type maps will be <br />provided for field use. <br />2. Set up proper traffic controls to inspect and clean the drainage facilities. <br />3. Remove manhole covers/grates to inspect and clean the drainage inlets/catch basins. <br />Assistance may be requested from the City for manhole covers that are locked, stuck, or <br />broken. <br />4. Record observations and measurements, and complete all sections of Catch <br />Basin/Channel Inspection and Cleaning Log according to protocols as established by the <br />City (See Attachment A and Attachment B). <br />2 <br />19E-4
The URL can be used to link to this page
Your browser does not support the video tag.