My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - 516 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
31A - CUP - 516 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:38:33 PM
Creation date
11/3/2011 1:00:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
11/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I (g) .BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />1 6.0 CONSULTANT RECOMMENDATION <br />Based on the information and environmental analysis contained in the Initial Study/Environmental <br />Checklist, we recommend that the City prepare a mitigated negative declaration for the Bender Ready- <br />Mix Concrete Manufacturing Project. We find that the proposed project could have a significant effect <br />on a number of environmental issues, but that mitigation measures have been identified that reduce <br />such impacts to a less than significant level. We recommend that the second category be selected for <br />the City's determination (See Section 7.0, Lead Apency Determination). <br />r <br />June 2011 iv_? - <br />Date Glenn Lajoie, AICP, Pro ect Manager <br />K RBF Consulting <br /> <br /> <br /> <br /> <br /> <br />n <br /> <br />L <br /> <br />JULY 2011 6-1 CONSULTANT RECOMMENDATION <br />31 A-103
The URL can be used to link to this page
Your browser does not support the video tag.