Laserfiche WebLink
' <br />(9) BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br /> <br /> <br />e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water <br />disposal systems where sewers are not available for the disposal of waste water? <br />No Impact No septic tanks or alternative wastewater systems would be constructed as part of the <br />project, and no impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br />JULY 2011 <br />4.6-5 <br />31A-55 <br />GEOLOGY AND SOILS