Laserfiche WebLink
BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />4.13 POPULATION AND HOUSING <br />Ir- <br /> <br /> <br />?I <br /> <br /> <br /> <br /> Less Than <br /> <br />would the <br />ect. <br />A roj = Potentialty Sigcant Less Tha <br />n <br />No <br /> Significant <br />' Impact With Significant <br />mpact <br /> Impact Mitigation - Impact <br /> Incorporated <br />a. Induce substantial population growth in an area, either <br />directly (for example, by proposing new homes and ? <br />businesses) or indirectly (for example, through extension of <br />roads or other Infrastructure)? <br />b. Displace substantial numbers of existing housing, <br />necessitating the construction of replacement housing ? <br />elsewhere? <br />c. Displace substantial numbers of people, necessitating the <br /> <br />construction of replacement housing elsewhere? <br />i ? <br />a) Induce substantial population growth in an area, either directly (for example, by proposing new <br />homes and businesses) or indirectly (for example, through extension of roads or other <br />infrastructure) ? <br />Less Than Significant Impact The existing Bender Ready-Mix facility employs approximately 12 full- <br />time workers. Even under the conservative assumption that all 12 employees and their families have <br />relocated to the project area, any increase in population growth would not be substantial given the <br />limited number of employees. <br />The proposed project would implement a range of aesthetic, drainage, water quality, and safety <br />improvements at the project site. These improvements would not increase the capacity of the existing <br />' concrete manufacturing facility nor would they increase the number of employees. Thus, impacts in <br />regards to population growth would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />b) Displace substantial numbers of existing housing, necessitating the construction of <br />replacement housing elsewhere? <br />No Impact The Bender Ready-Mix facility exists within a fully developed, industrialized area. No <br />housing or people have been displaced by the operation of the concrete manufacturing facility. In <br />' addition, none of the aesthetic, drainage, water quality, and safety improvements associated with the <br />project would result in the displacement of any housing or people. Thus, no impacts would occur in this <br />regard. <br />Mitigation Measures: No mitigation is required. <br />C) Displace substantial numbers of people, necessitating the construction of replacement housing <br />elsewhere? <br />No Impact Refer to Response 4.12(b). <br />Mitigation Measures: No mitigation is required. <br />JULY 2011 4.13-1 POPULATION AND HOUSING <br />31A-83