My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - 516 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
31A - CUP - 516 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:38:33 PM
Creation date
11/3/2011 1:00:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
11/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br /> <br /> <br /> <br />1 <br /> <br />E <br /> <br /> <br />4.17 UTILITIES AND SERVICE SYSTEMS <br /> <br />[ Less Than <br />Would the project: Potentially Significant ' LessTha`n No <br /> Significant Impact With Significant <br />ImPaM <br /> Impact Mitigation Impact <br /> Incorporated ' <br />a. Exceed wastewater treatment requirements of the applicable <br /> <br />Regional Water Quality Control Board? ? <br />b. Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing ? <br />facilities, the construction of which could cause significant <br />environmental effects? <br />c. Require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, the ? <br />construction of which could cause significant environmental <br />effects? <br />d. Have sufficient water supplies available to serve the project <br />from existing entitlements and resources, or are new or ? <br />expanded entitlements needed? <br />e. Result in a determination by the wastewater treatment <br />provider which serves or may serve the project that it has ? <br />adequate capacity to serve the project's projected demand in <br />addition to the rovider's existing commitments? <br />f. Be served by a landfill with sufficient permitted capacity to <br />accommodate the project's solid waste disposal needs? <br />g. Comply with federal, state, and local statutes and regulations <br /> <br />related to solid waste? ? <br />a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control <br />Board? <br />Less Than Significant Impact The existing Bender Ready-Mix facility does not currently exceed <br />wastewater treatment requirements, since it employs only 12 full-time staff. In addition, wash water <br />utilized in the concrete manufacturing process is recycled on-site. Improvements associated with the <br />proposed project would not result in any alteration or expansion of existing operations on-site. As such, <br />impacts in this regard would be less than significant. <br />Mitigation Measures: No mitigation measures are required. <br />b) Require or result in the construction of new water or wastewater treatment facilities or <br />expansion of existing facilities, the construction of which could cause significant environmental <br />' effects? <br />No Impact. Existing operations at the Bender Ready-Mix facility are adequately served by existing <br />infrastructure in the site vicinity. The minor aesthetic, drainage, water quality, and safety improvements <br />associated with the project would not result in any additional need for water or wastewater service. <br />Thus, no impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br />JULY 2011 4.17-1 UTILITIES AND SERVICE SYSTEMS <br />31A-93
The URL can be used to link to this page
Your browser does not support the video tag.