My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - FOUNTAIN MAINT SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
25H - AGMT - FOUNTAIN MAINT SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:38:27 PM
Creation date
11/3/2011 2:25:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
11/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recyclable Materials. Materials that normally have been or would be discarded and that may be reused after under going some type of <br />physical or chemical processing. Recyclable materials do not include precious metal bearing scrap and those items that may be used again <br />for their original purpose or function without any special processing. <br />Routine Services. Services which are required on a regular basis within each billing period. These normally include services performed at a <br />frequency or at least once per month, e.g., daily or weekly. <br />Work Day. A normal duty day, Sunday through Saturday. <br />C.3 Contractor Furnished Property and Services <br />C.3.1 General. Contractor furnished property and services shall be compatible with existing City systems and equipment as necessary to <br />perform the requirements of the Agreement. The Contractor shall furnish all property and services not specifically identified in Section C.C.4.2 <br />24-Hour Contact Number <br />The Contractor shall provide the Director with a telephone number at which a contact person for the Contractor may be <br />reached 24 hours a day. The contact person shall be required to respond back to the Director or his representative within 1 <br />hour. The contact person shall have the appropriate knowledge and/or authority to take appropriate action in response to <br />any emergency situation that may arise involving the contractor's responsibilities hereunder. <br />C.3.2.1 Responsibility for Work. The Contractor shall be responsible for all damages to people and/or property that occur as a <br />result of the fault or negligence of said Contractor or his employees in connection with the performance of this work. <br />C.3.2.2 Failure to Perform Satisfactory <br />C.3.2.2.1 City Inspection. The Director or his designated representative shall regularly inspect fountains all other City property subject to this <br />Agreement. If said inspection results in discovery of work that is not performed in the manner, and to the professional degree set forth in the <br />Specifications, Contractor agrees that the City shall deduct from Contractor's next monthly payment, the City's actual or estimated cost of <br />performing the work to bring the property into conformance with the specifications. Additionally, City shall impose liquidated damages of up to <br />$300.00 per inspection, per fountain, per day not meeting the specifications during any such inspection. <br />C.3.2.2.2 Billing Adjustments. The Director may make a billing adjustments in monthly payment for the cost to the City to remedy <br />insufficiencies in service rendered by the Contractor. Billing adjustments for this unsatisfactory service may be permanent retention of 100% <br />of the estimated monthly cost for work that is incomplete or deficient as stated herein. <br />C.3.2.3 Hazards. The Contractor shall maintain all work sites free of hazards to persons and/or property resulting from his <br />operations. Any hazardous condition noted by the Contractor, which is not a result of his operations, shall be immediately reasonably <br />mitigated then reported to the Parks, Recreation & Community Services Agency. <br />C.3.2.4 Property Damage. Any damage to City property that occurs shall be immediately reported to the Director. The cost of <br />repair, if required, will be at the Contractor's expense. If damage occurs to any adjacent turf, groundcover, shrubs or trees as result of the <br />Contractor's negligence for the cost for necessary repair or replacements of the same shall be at the Contractor's expense. <br />C.3.2.5 Access to Private Property. Prior to any work that will restrict access to private property, the Contractor shall notify each <br />affected property owner or responsible person, informing him of the nature of and the approximate duration of the restriction. <br />C.3.2.6 Emergency Service. Twenty-four hours per day, seven days per week, the Contractor shall be able to receive and respond <br />to the City's call for emergency service. Response time shall be less than two hours to remove or eliminate a public safety hazard. Contractor <br />shall provide the City with a local telephone number where Contractor can be contacted twenty-four hours per day, seven days per week. <br />C.3.2.7 Contractor Furnished Equipment. The Contractor shall provide all items necessary for the performance of the contract <br />including the following. <br />C.3.2.7.1 Tools. The Contractor shall provide all tools and repair equipment necessary for maintenance and repair as specified in the <br />Agreement. <br />25H-14
The URL can be used to link to this page
Your browser does not support the video tag.