My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
FULL PACKET_2011-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:29:40 PM
Creation date
11/3/2011 3:52:09 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C.3.2.8 Contractor Furnished Supplies. The Contractor shall furnish all supplies required for his performance under the <br />Agreement, including the following. <br />C.3.2.8.1 Chemicals. The Contractor shall furnish all chemicals and supplies to maintain the water at the prescribed standards of <br />purity and clarity including, but not limited to chlorine (liquid, tablets, granular, or gaseous, depending on the type of dispensing system in <br />use), soda ash, diatomaceous earth, etc. <br />C.3.2.8.2 Test Kits. The Contractor shall furnish test kits for the purpose of monitoring and reporting chemical levels and conditions <br />including but not limited to chlorine levels, pH levels, and alkalinity of the water, etc. <br />C.3.2.8.3 Preventive Maintenance (PM) and Minor Repair Items. The Contractor shall provide all PM and minor repair items <br />including, but not limited to, lubricants, minor parts, fittings, gaskets, bench stock, paint, degreasers, etc. for performance under the contract. <br />C.3.2.8.4 Cleaning Supplies. The Contractor shall furnish cleaning supplies required for performance under the contract. <br />25H -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.