My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
FULL PACKET_2011-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:29:40 PM
Creation date
11/3/2011 3:52:09 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />Drainage and Water Quality , <br />• A detention /desilting basin would be constructed in the southeastern portion of the site. This ' <br />basin would be approximately 400 square feet in size and would improve water quality by <br />detaining stormwater on -site. <br />• Three segments of 24 -inch bottomless trench (with 4 -inch perforated overflow pipe) would be <br />installed along the South Santa Fe Street frontage. The segments would be installed across <br />the three vehicle access points, and would drain into landscaped areas or the proposed <br />detention / desilting basin. <br />Safety <br />• One existing chain -link access gate along South Santa Fe Street swings open towards the <br />roadway. This gate would be replaced by a rolling gate to eliminate any encroachment or <br />safety hazard for vehicles passing by the site. <br />• South Santa Fe Street would be repaved from its centerline to the Bender Ready -Mix property <br />line frontage. <br />2.5,1 PHASING <br />The proposed improvements at the project site would occur in a single phase. Construction is <br />anticipated to begin in late 2011 and would last approximately three months. <br />2.6 PERMITS AND APPROVALS <br />The City approvals required for implementation of the project will include the following, among others: <br />• California Environmental Quality Act clearance <br />• Conditional Use Permit <br />• Lot Merger <br />• Site Plan Review <br />• Grading /Building Permits <br />JULY 2011 2 -6 PROJECT DESCRIPTION <br />31A-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.