Laserfiche WebLink
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />h Initial Study /Mitigated Negative Declaration <br />Mitigation Measures: No mitigation is required. <br />d) Create a new source of substantial light or glare which would adversely affect day or nighttime <br />views in the area? <br />a <br />JULY 2011 4.1 -3 AESTHETICS <br />31A-35 <br />No Impact. <br />Short -Term Impacts <br />Short-term light and glare impacts are anticipated to be minimal, since no nighttime construction would <br />be required for project implementation. Therefore, no impact would occur in this regard. <br />Long -Term Impacts <br />Security lighting currently exists at the Bender Ready -Mix facility. Light/glare also occurs as a result of <br />existing vehicle headlights on roadways surrounding the site. Given the developed and industrialized <br />nature of the project area, operations at the Bender Ready -Mix facility do not result in impacts that <br />adversely affect nighttime views in the area. <br />The proposed project would not result in any new lighting on -site. In addition, the project would not <br />result in any expansion of long -term operations that would result in an increased number of vehicle trips <br />to and from the site. Thus, impacts in this regard would not occur. <br />Mitigation Measures: No mitigation is required. <br />a <br />JULY 2011 4.1 -3 AESTHETICS <br />31A-35 <br />