My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
FULL PACKET_2011-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:29:40 PM
Creation date
11/3/2011 3:52:09 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT , <br />Initial Study /Mitigated Negative Declaration <br />temporary lane closure /rerouting signage during the brief period when repaving activities occur. Thus, , <br />impacts in this regard would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />I <br />h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, <br />including where wildlands are adjacent to urbanized areas or where residences are intennixed I <br />with wildlands? <br />No Impact The proposed project site is located within a completely urbanized area that is void of any ' <br />wildland areas. In addition, based on the Public Safety Element of the City's General Plan, the project <br />site is located outside of a designated fire hazard area. The proposed project would not expose people <br />or structures to wildland fires. Thus, no impact would occur in this regard. ' <br />Mitioation Measures: No mitigation is required. <br />1 <br />JULY 2011 4.8 -4 HAZARDS AND HAZARDOUS MATERIALS t <br />31A-64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.