Laserfiche WebLink
1 4.11 MINERAL RESOURCES <br />r <br />r <br />BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />Would the project <br />f?otenttallg <br />Less Thah <br />$ign�flcant ` <br />Less Than <br />Less Than Siciniticant Impact The existing facility at the project site operates as a concrete <br />Signfficant <br />' <br />,Impact With <br />Signfflcant ' <br />Impact <br />Impact <br />Mlhgation <br />Impact <br />, <br />ti,.. <br />' <br />Inc'orporated <br />Department of Conservation, in order to ensure that mineral resources are not substantially depleted. <br />a. Result in the loss of availability of a known mineral resource <br />Moreover, proposed aesthetic, drainage, water quality, and safety improvements associated with the <br />project would not result in any increaseln capacity at the existing Bender Ready -Mix facility and the <br />that would be of value to the region and the residents of the <br />' <br />than significant. <br />✓ <br />Mithration Measures: No mitigation is required. <br />state? <br />Result in the loss of availability of a locally- important mineral resource recovery site delineated <br />on a local general plan, specific plan or other land use plan? <br />b. Result in the loss of availability of a locally- important mineral <br />Mitigation Measures: No mitigation is required. <br />resource recovery site delineated on a local general plan, <br />✓ <br />j specific plan or other land use plan? <br />a) <br />Result in the loss of availability of a known mineral resource that would be of value to the region <br />' <br />and the residents of the state? <br />Less Than Siciniticant Impact The existing facility at the project site operates as a concrete <br />' <br />manufacturing plant. The facility produces and sells large quantities of concrete through the processing <br />of aggregate and other raw materials. The concrete is prepared, loaded into truck- mounted rotating <br />drum mixers, and hauled away for use at construction sites. <br />The existing facility does not involve the direct mining or extraction of aggregrate (e.g., sand and gravel) <br />or other materials used in the concrete manufacturing process. Rather, these materials are recovered <br />' <br />or recycled elsewhere and delivered to the site. Mining activities in other locations are regulated under <br />the California Surface Mining and Reclamation Act (SMARA), administered by the California <br />Department of Conservation, in order to ensure that mineral resources are not substantially depleted. <br />' <br />Moreover, proposed aesthetic, drainage, water quality, and safety improvements associated with the <br />project would not result in any increaseln capacity at the existing Bender Ready -Mix facility and the <br />amount of aggregate materials utilized would not increase. Thus, impacts in this regard would be less <br />' <br />than significant. <br />Mithration Measures: No mitigation is required. <br />b) <br />Result in the loss of availability of a locally- important mineral resource recovery site delineated <br />on a local general plan, specific plan or other land use plan? <br />Less Than Si_anirrcant Impact Refer to Response 4.11(a), above. <br />Mitigation Measures: No mitigation is required. <br />' JULY 2011 4.11 -1 MINERAL RESOURCES <br />31A-73 <br />Ki <br />