Laserfiche WebLink
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT ' <br />Initial Study /Mitigated Negative Declaration <br />Upon implementation <br />, <br />of aesthetic, drainage, water quality, and safety improvements associated with <br />the project, noise in the project area would not increase. The project site would continue operations as <br />a concrete manufacturing facility and no new stationary noise sources would be introduced. These <br />operational activities would continue with project implementation, and no additional stationary noise <br />sources are proposed. Impacts in this regard are less than significant. <br />Mitigation Measures: No mitigation is required. <br />, <br />d) Result in a substantial temporary or periodic increase in ambient noise levels in the project <br />vicinity above the levels existing without the project? <br />' <br />Less Than Si_anificant Refer to Responses 4.12(a) and 4.12(b), above. <br />' <br />Mitigation Measures: No mitigation is required. <br />e) For a project located within an airport land use plan or, where such a plan has not been <br />adopted, within two miles of a public airport or public use airport, would the project expose <br />people residing or working in the project area to excessive noise levels? <br />No Impact. The nearest airport to the project site is the John Wayne Airport, located approximately <br />' <br />four miles to the south. Therefore, no impact would occur. <br />Miti_ation Measures: No mitigation is required. <br />f) For a project within the vicinity of a private airstrip, would the project expose people residing or <br />working in the project area to excessive noise levels? <br />No Impact. Refer to Response 4.12(e). <br />, <br />Mitigation Measures: No mitigation is required. <br />II <br />JULY 2011 4.12 -8 NOISE <br />31A-82 <br />