Laserfiche WebLink
1 <br />BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />4.17 UTILITIES AND SERVICE SYSTEMS <br />a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control <br />Board? <br />Less Than Significant Impact The existing Bender Ready -Mix facility does not currently exceed <br />wastewater treatment requirements, since it employs only 12 full -time staff. In addition, wash water <br />utilized in the concrete manufacturing process is recycled on -site. Improvements associated with the <br />proposed project would not result in any alteration or expansion of existing operations on -site. As such, <br />impacts in this regard would be less than significant. <br />Mitigation Measures: No mitigation measures are required. <br />b) Require or result in the construction of new water or wastewater treatment facilities or <br />expansion of existing facilities, the construction of which could cause significant environmental <br />' effects? <br />No Impact. Existing operations at the Bender Ready -Mix facility are adequately served by existing <br />infrastructure in the site vicinity. The minor aesthetic, drainage, water quality, and safety improvements <br />associated with the project would not result in any additional need for water or wastewater service. <br />Thus, no impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br />JULY 2011 4.17 -1 UTILITIES AND SERVICE SYSTEMS <br />31A-93 <br />Less Than t <br />W4uldtheproecf ',gF - <br />Potentially <br />Significant <br />LessThart <br />. <br />' <br />Significant . <br />tn►pac With <br />Stgniflcant <br />No <br />} <br />e <br />Irnpact <br />Mitigation <br />Impact <br />Impact <br />Incorporated <br />a. Exceed wastewater treatment requirements of the applicable <br />Regional Water Quality Control Board? <br />✓ <br />b. Require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing <br />facilities, the construction of which could cause significant <br />✓ <br />environmental effects? <br />c. Require or result in the construction of new storm water <br />drainage facilities or expansion of existing facilities, the <br />construction of which could cause significant environmental <br />✓ <br />effects? <br />d. Have sufficient water supplies available to serve the project <br />from existing entitlements and resources, or are new or <br />✓ <br />expanded entitlements needed? <br />e. Result in a determination by the wastewater treatment <br />provider which serves or may serve the project that it has <br />adequate capacity to serve the project's projected demand in <br />✓ <br />addition to the providers existing commitments? <br />f. Be served by a landfill with sufficient permitted capacity to <br />accommodate the project's solid waste disposal needs? <br />g. Comply with federal, state, and local statutes and regulations <br />related to solid waste? <br />✓ <br />a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control <br />Board? <br />Less Than Significant Impact The existing Bender Ready -Mix facility does not currently exceed <br />wastewater treatment requirements, since it employs only 12 full -time staff. In addition, wash water <br />utilized in the concrete manufacturing process is recycled on -site. Improvements associated with the <br />proposed project would not result in any alteration or expansion of existing operations on -site. As such, <br />impacts in this regard would be less than significant. <br />Mitigation Measures: No mitigation measures are required. <br />b) Require or result in the construction of new water or wastewater treatment facilities or <br />expansion of existing facilities, the construction of which could cause significant environmental <br />' effects? <br />No Impact. Existing operations at the Bender Ready -Mix facility are adequately served by existing <br />infrastructure in the site vicinity. The minor aesthetic, drainage, water quality, and safety improvements <br />associated with the project would not result in any additional need for water or wastewater service. <br />Thus, no impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br />JULY 2011 4.17 -1 UTILITIES AND SERVICE SYSTEMS <br />31A-93 <br />