Laserfiche WebLink
PROJECT HISTORY & SUMMARY <br />History: <br />¦ Project is part of mitigation for Tustin Legacy Project, City of Tustin, <br />approved in 2003 <br />- Redevelopment of the former Tustin Marine Corps Air Station <br />with mixed-use commercial, residential, and industrial <br />- Traffic impact mitigation measure provides funds for design <br />and environmental processing <br />¦ This segment is currently a bottleneck - both sides of this segment <br />are already 6 lanes <br />¦ Preliminary engineering and environmental work was initiated in <br />2009 <br />Summary: <br />¦ Widening is needed to address growth trends and congested traffic <br />¦ Proposed widening is from 4 lanes to 6 lanes between Grand <br />Avenue and Main Street <br />¦ Project is consistent with County Master Plan of Highways (MPAH) <br />¦ Project is consistent with City's General Plan Circulation Element <br />EXISTING CONDITIONS <br />¦ Existing residential and commercial/industrial uses <br />¦ Four lanes (2 lanes in each direction) <br />¦ Signals at: <br />- Main St. <br />- Pacific Electric Bike Trail (Anahurst PI.) <br />- Halladay St. <br />- Standard Ave. <br />- Fire Station (Beeson Ln.) <br />- Grand Ave. <br />¦ At-grade railroad crossing between Standard Ave. and Hathaway <br />St. <br />¦ Utilities (power poles/lines) <br />CITY COUNCIL MINUTES 11 OCTOBER 17, 2011