My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFP - ENVIRONMENTAL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/28/2011
>
19C - RFP - ENVIRONMENTAL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:37:25 PM
Creation date
11/22/2011 3:23:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
19C
Date
11/28/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. SCOPE OF SERVICES <br />The Consultant shall provide technical environmental services under the direction of City <br />staff. The Consultant will be expected to provide experienced and knowledgeable <br />professional staff. The Consultants' Project Manager and staff shall be responsive and <br />maintain excellent working relationships with project applicant, property owners, developers <br />and City staff. The Consultant shall be committed to provide adequate staffing levels at all <br />times in order to adhere to established schedules. The Consultant shall be knowledgeable <br />and very familiar with federal, state and local regulations, policies and procedures as they <br />pertain to CEQA services provided. <br />Consultant services may include attendance at appropriate City Commission, City Council <br />meetings, and preparation of studies and technical reports. If determined necessary, the <br />consultant shall be required to discuss the project with City Staff and applicant within two- <br />weeks of approving proposal and receiving the notice to proceed from the City. At that time <br />staff and applicant will provide all information pertinent to the project. <br />It shall be the responsibility of the selected consultant to prepare the appropriate environmental <br />documentation in conformance with the California Environmental Quality Act. The City staff <br />shall work closely with the consultant in achieving a legally defensible document. As part of <br />the proposed MND, the following shall be addressed. Please identify the scope of work and <br />related cost estimate by the categories listed below. <br />A. Initiation of the Project/Kick-Off: Attend a kick-off meeting to discuss the project <br />with City staff within five working days of receiving a notice to proceed. At this time, <br />staff will present all information about the project; discuss any project constraints and <br />issues, and refine the scope and responsibilities. <br />B. Preparation of technical studies: Technical studies shall be prepared and provided by <br />the selected consultant that, at a minimum, are those listed in CEQA Appendix G: <br />Environmental Checklist Form of the CEQA Guidelines. The Public Works Agency is <br />requiring that, at a minimum a site Traffic Impact Analysis (TIA) and a sewer capacity <br />study be prepared. A more detailed scope of work will be provided to the selected <br />consultant. Planning Division is requiring a review of the submitted parking study, and <br />possibly noise light intrusion impacts. <br />C. Preparation of the mitigated negative declaration: The consultant will prepare the <br />environmental document for the project. This will include meeting with the City for the <br />purpose of obtaining information necessary for preparation of complete project <br />description, establishing early communications among the various team members, and <br />familiarizing the consultant with the issues and concerns identified for analysis. In <br />addition, the preparation of a draft MND shall be included as part of this task. <br />D. Preparation of the final MND: The consultant shall prepare a final MND that is <br />consistent with all applicable provisions of the California Environmental Quality Act. This <br />will include the response to comments, the mitigation monitoring and reporting program, <br />and all other related documents. <br />4 <br />19C-6
The URL can be used to link to this page
Your browser does not support the video tag.