My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/28/2011
>
25C - AGMT - CATCH BASIN PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:37:31 PM
Creation date
11/23/2011 4:39:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/28/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vv? <br />(west Coast Storm,Inc. <br />Storm IVater arrd Enrironme»tal Solullons <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 080-591792 <br />West Coast Storm Screen <br />Automatic Retractable Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Attachment A. Scope of Work) <br />12) All ARS devices have a locking mechanism that in the closed position prevents the <br />brushes of street sweeping equipment from opening the screen when sweeping in front of <br />the screen. The mechanism is a gear designed to automatically release and allow the <br />screen to fully open with the flow of water per Operation Section below. <br />13) The gear locking mechanism for automatically opening the screen is opened by the force <br />of water acting on the inner screen adjusted to open at specified water flow height. <br />Manual release of the screen: push a screwdriver into any lower main screen hole and <br />push the inner screen back to release main screen. <br />14) The main screen extension is adjusted to specified gap from bottom of catch basin curb <br />opening. The main screen extension is used to insure a uniform %z inch gap from the <br />bottom of the screen to the bottom of the catch basin curb opening across uneven <br />surfaces. <br />15) The ARS device must open as required when the screen is partially blocked with trash. <br />Note: As an approved County device, the West Coast Storm Screen passed testing by the <br />County of Los Angeles which included hydro-testing and trash and debris blocking <br />requirements. <br />Fabrication The ARS device meets the following requirements: <br />1) The ARS device is fabricated with a built in overflow or top gap specified. <br />2) The main screen has 0.75 inch round openings with a 50% open pattern. The main screen <br />extension has 0.75 inch round openings as well. <br />3) Inner screen extension is adjusted for required water height opening (unlocking) per <br />specifications. <br />4) A standard 0.50 inch gap between the main screen and the ARS device ends is built in. <br />5) Parts are CNC punched to -f-/- 0.005 tolerance. <br />6) All parts are released for fabrication with applicable shop drawings and CNC programs. <br />7) Completed ARS devices are marked with location ID. <br />8) Completed ARS devices include all hardware and extensions. <br />9) ARS devices are shipped completely assembled. <br />Page 4 of 45 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 - Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General A/HAZ Contractor License Number: 888152 <br />25C-25
The URL can be used to link to this page
Your browser does not support the video tag.