My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - CATCH BASIN PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/28/2011
>
25C - AGMT - CATCH BASIN PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:37:31 PM
Creation date
11/23/2011 4:39:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
11/28/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(west Coast Stonn.Inc. <br />Storm Water and Cnvironinental Solutions <br />County of Orange, OC Public Works <br />Automatic Retractable Screen Excluders, Connector Pipe Screen Full Capture Trash <br />Systems, and Catch Basin Inserts <br />RFP# 0$0-591792 <br />West Coast Storm Screen <br />Automatic Retractable Screen <br />Equipment Design and Specification Report <br />(Information provided to the City as requested in the RFQ documents under <br />Altachment A. Scope of Work) <br />6. Place a level on the front end (85-001), and verify the unit is vertically level. Upon <br />adjustment of the unit to vertical level position, ensure positioning is 1-inch horizontally <br />from center of front screen to curb batter line. <br />7. Once the unit is level and proper positioning is verified, the technician will secure the <br />unit for installation. <br />8. Slide the mounting brackets (85-009) up and/or down until they meet the wall face. <br />9. Tighten the 3/8-16 hex nuts to the ARS unit utilizing Loctite Red (thread locker). <br />10. Utilizing the Hammer Drill, drill two 3/8-inch pilot holes into the concrete. Drill the two <br />holes a minimum of 6 inches apart in the sidewalls. <br />11. Hammer the 3/8-inch drop anchor SS sleeve as straight as possible until it is imbedded a <br />minimum of 3-inches into the wall. <br />12. Place the standard washer and 3/8-16 nuts onto the 3/8-inch concrete drop anchor. Drill <br />the two holes a minimum of 6 inches apart in the sidewalls. <br />13. Use a 14mm open-end wrench or socket ratchet and tighten until secure. Utilize Loctite <br />Red (thread locker) before securing. <br />Site-specific Measurements Required. <br />West Coast Storm, Inc. requires minimum information prior to measuring, only drain <br />location. In the even there is not clear data on drain locations, we can locate them upon <br />municipality approval. Information provided to municipalities will include GPS coordinates, <br />address, as well as catch basin measurements. We can and will work with municipal staff to <br />acquire the proper information needed to import into a GIS mapping layer database. <br />Equipped with an industry leading ACCESS database helps us export the information to <br />create GIS mapping layers. <br />Page 34 of 45 <br />654 South Lincoln Avenue, San Bernardino, CA 92408 - Telephone 909.890.5700 Facsimile 909.890.5988 <br />California General AMAZ Contractor License Number: 888152 <br />25C-34
The URL can be used to link to this page
Your browser does not support the video tag.