My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREENLAND CONSTRUCTION, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
GREENLAND CONSTRUCTION, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:02:25 PM
Creation date
12/2/2011 9:09:45 AM
Metadata
Fields
Template:
Contracts
Company Name
Greenland Construction Inc.
Contract #
09-6035
Agency
Public Works
Council Approval Date
11/28/2011
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />Paul Walters <br />To: City Manager <br />Date: June 14. 2012 <br />Raul Godinez II, Executive Director <br />From: Public Works Agency <br />Subject: PROJECT NO. 09 -6035 <br />SEVENTEENTH STREET TRIANGLE <br />CHANGE ORDER NO. 1 <br />Contractor: Greenland Construction, Inc. <br />7050 Owens mouth Avenue, Suite 209 <br />Canoga Park, CA 91303 <br />Project Description: Seventeenth Street Triangle <br />Change Order Number: 1 Amount: <br />Account Unit: 16113262- 66220 - 09603501028 <br />Original Contract Cost: $140,740 <br />$25, 343.33 <br />of Original <br />Amount of The <br />Change Order: $25,343.33 18.01 <br />Previously Approved $ -O- O% <br />Change Orders: <br />Total Change Orders: $25,343.33 18.01 <br />REASON FOR CHANGES <br />1. The Design Engineering Section requested to infill the steps with concrete <br />leading down to an adjacent property to avoid a tripping hazard. Prior approval <br />was obtained on February 7, 2012. <br />FINAL COST = $365.38 <br />2. After removing the existing fencing at the edge of bike path, the 2X12 wooden <br />planks which supported the pavement, gave way and caused some undermining <br />of the path. Therefore Design Engineering Section requested to install a <br />concrete retaining curb to replace the wooden planks_ Prior approval was <br />obtained on February 7, 2012. <br />FINAL COST = $7,888.58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.