My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGREEMENT ICF INTERNATIONAL 1901 N. FAIRVIEW ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
25A - AGREEMENT ICF INTERNATIONAL 1901 N. FAIRVIEW ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:20 PM
Creation date
12/16/2011 12:32:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25A
Date
12/19/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Academy Charter High School MND I City of Santa Ana Planning Division <br />Family Residential Project for the City. This document is out for public review, and the project should be <br />complete in January. Renee's daily focus Is on client interaction, project coordination, management, and <br />oversight. In addition, she often functions as the lead author and is excellent at evaluating technical studies, <br />preparing complex impact analysis, and integrating regulatory requirements. Renee's skill strengths include <br />collaborative critical thinking, excellent writing, accomplished project management, effective team leadership, <br />and being solution oriented. <br />Project Director. Chad Beckstrom, AICP, is a principal with ICF who brings more than 15 years of experience <br />managing and overseeing the preparation of CEQA documentation for various types of projects. Chad has a <br />long history working with the City and is currently serving as the project director for The Met at South Coast <br />Multi-Family Residential Project IS/MND. He managed our previous as-needed environmental services contract <br />with the City, where he was responsible for overseeing the preparation of CEQA documentation for several <br />small-scale developments, including the Alton Court IS/MND, Gateway Corporate Center IS/MND, West End <br />Lofts EIR, California Palms Residential Conversion, and Enterprise Zone IS/MND. Chad has also provided <br />CEQA advisory services to City staff through formal CEQA training, in his role as an on-site extension of staff at <br />the City's office for six months. He brings the continuity necessary to apply our experience and knowledge of the <br />City's processes and preferences to this particular effort. He is also the project director for our master <br />services contract with the LAUSD that ICF has held since 1998 and has managed or overseen dozens of <br />CEQA documents for new school development projects sited within existing developed neighborhoods. <br />Key Technical Staff <br />Aesthetics/Visual Resources. Jennifer Stock, LA, brings more than 11 years of experience in visual impact <br />analysis and serves as one of ICF's leads for visual resources. Jennifer has prepared visual resources and <br />shade/shadow analyses for CEQA documents, as well as construction documents, using Autodesk Civil 3D. She <br />brings unique expertise in assessing the visual environment in greater detail, determining how a project may <br />negatively or beneficially affect visual landscapes, and developing methods to improve aesthetics and expertise <br />in mitigation planning and design. <br />Air Quality/ Greenhouse Gas (GHG) Emissions. Keith Cooper, AICP, has more than 12 years of professional <br />experience as an air quality specialist preparing air quality studies and conducting analysis for CEQA <br />documents. His areas of expertise include criteria pollutant and GHG emissions inventories, air toxics health risk <br />assessments, transportation conformity determinations, and general conformity determinations. Keith has <br />prepared or overseen the preparation of hundreds of air quality impact assessments/reports that document air <br />pollutant emissions and concentrations related to various public infrastructure and private development projects. <br />He has a thorough understanding of the National and State Ambient Air Quality Standards, general and <br />transportation conformity requirements, rules and regulations adopted by local air districts (e.g., South Coast Alr <br />Quality Management District [SCAQMD]), and climate change/GHG emissions quantification and evaluation <br />requirements. <br />CEQA Documentation. Aaron Brownwood Is an urban and environmental planner with more than five years of <br />experience in the urban planning and environmental processes for a variety of public agencies and private <br />developers. He prepares CEQA documents and master plans, conducts public outreach workshops, and <br />processes a variety of discretionary projects. Aaron is currently preparing an EIR for the Port of Los Angeles to <br />analyze a project involving the adaptive reuse of an industrial shipyard as a public space and educational center <br />in San Pedro. He was also a technical author for a large portion of the City of Santa Ana Met Project MND. . <br />CEQA Documentation. Tanya Jones is trained in environmental analysis and design and contributes to CEQA <br />projects by preparing environmental analysis, providing assistance to project managers, coordinating between <br />project managers and technical specialists, and facilitating scoping meetings. Tanya has experience with infill, <br />redevelopment, and school projects. Her most recent school project experience includes preparation of <br />responses to comments and the final EIR for the LAUSD South Region High School No. 15 project. <br />Page 4 <br />25A-16
The URL can be used to link to this page
Your browser does not support the video tag.