My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - COOPERATIVE AGREEMENT OCTA PROJECTS 126770, 126771 AND 126772
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
25B - COOPERATIVE AGREEMENT OCTA PROJECTS 126770, 126771 AND 126772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:24 PM
Creation date
12/16/2011 12:32:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
12/19/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
View images
View plain text
AGREEMENT C-1-3023 <br />Warner Avenue <br />ATTACHMENT A <br />INTRODUCTION <br />Project P Corridor <br />Scope of Work <br />Warner Avenue <br />The Renewed Measure M (M2), Project P - Regional Traffic Signal Synchronization Program <br />(RTSSP) is a multi-agency, corridor-.based approach that optimizes traffic signal timing based <br />on analysis of metrics obtained from existing traffic patterns. This approach acknowledges local <br />agency responsibility and control of signal timing and coordinates with project agencies to <br />develop acceptable synchronization timing. The PARTICPATING AGENCIES/AGENCY <br />(AGENCIES) along the Warner Avenue corridor (PROJECT) have requested, as detailed in the <br />approved application, that the Orange County Transportation Authority (AUTHORITY) be <br />designated as the LEAD AGENCY. AUTHORITY will administer the work with the assistance of <br />consulting or contractor services to provide project management, traffic signal timing <br />optimization, and implementation of approved equipment upgrades as submitted in the <br />application for PROJECT. This scope requires the active assistance by all corridor AGENCIES <br />throughout the process even without special reference to their participation. <br />PROJECT TRAFFIC SIGNAL SYNCHRONIZATION - PRIMARY IMPLEMENTATION <br />The following is an outline of the scope of services for PROJECT Primary Implementation that is <br />associated with developing and implementing optimal PROJECT time-of day traffic signal <br />coordination plans: <br />1) Project Administration <br />AUTHORITY shall provide general project administration, environmental processing, and <br />quality control. PARTICIPATING AGENCIES shall provide support project management <br />services for the project intersections located within their jurisdiction and assist in maintaining <br />PROJECT schedule. <br />a) Data Collection <br />The AUTHORITY will assemble with the assistance of PARTICIPATING <br />AGENCIES the necessary data to understand the existing traffic conditions for <br />the PROJECT and its respective traffic signal operations. This shall include, at <br />minimum, the following: <br />All data, documents, plans, photos, etc. related to each Project intersection <br />within the past two years <br />25B-45
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).