Laserfiche WebLink
AGREEMENT C-1-3023 <br />PROJECT P - WARNER AVENUE - WORK BY LOCATION <br />ATTACHMENT A <br />Comments, Wishes, Needs of Huntington Beach <br />rinnteersection ions: Enter any special circumstance such as conduit, communications, central or <br />ster modifications, new systems, TMC, YIDS, etc. that are not part of the <br />listing on the Main Data Sheet. Prioritize with 1 being best and 5 being worst. <br />ms if you wish. <br /> Description Comments <br /> <br />1 Replace existing TWP interconnect (in existing 1.5" <br />conduits) with new 96-strand SMFO from <br />Algonquin to Newland along Warner Ave: 21,200 <br />feet (not accounting for slack in pull boxes) <br />2 Upgrade existing pull boxes for new fiber to #6E at <br />the cabinet and #6 in between signals estimating approximately <br />every-600 feet <br /> <br />3 Communication equipment at each signal along the <br />fiber path (13 total): <br />1) Fiber Patch Panel; 2) Ethernet Switch; 3) Splice <br />Enclosure <br />4 Interconnect with City of Fountain Valley at <br />Warner/Magnolia <br /> <br /> <br /> <br /> <br /> <br />25B-52