Laserfiche WebLink
AGREEMENT C-1-3024 <br />PROJECT P - TUSTIN AVENUE ! ROSE DRIVE - WORK BY LOCATION <br />ATTACHMENT A <br />Comments, Wishes, Needs of Tustin <br />Instructions: Enter any special circumstance such as conduit, communications, central or field master <br />modifications, new systems, TMC, VI DS, etc. that are not part of the intersection listing on the Main Data <br />Sheet. Prioritize with 1 being best and 5 tieing worst. Add items if you wish. <br />Traffic signal on Tustin Ave./First St. Will require The original cost of $20,000 was based on <br />1 additional $8,000 because this is a field master the cost of replacing a local controller and <br />cabinet <br />25B-82