Laserfiche WebLink
EXHIBIT A-I <br />SUMMARY SCOPE OF WORK FOR DEFINITION AND ANALYSIS OF INITIAL OPERATING <br />SEGMENTS FOR THE SANTA ANA-GARDEN GROVE FIXED GUIDEWAY <br />In support of the definition and analysis of an Initial Operating Segment (IOS) for the Santa Ana- <br />Garden Grove Fixed Guideway, the Cordoba Team will complete the following tasks in <br />conjunction with the Santa Ana and Garden Grove Fixed Guideway Corridor Study. <br />Conceptual Engineering <br />The Cordoba Team will develop design concepts for Initial Operating Segments (IOS's) for <br />Streetcar 1 and Streetcar 2 with the western terminus of the project in the vicinity of Raitt <br />Street, and two alternatives for the location of the O&M facility (near Raitt Street and near <br />SARTC). The concept design will include review of spacing and locations of the substations, <br />development of an operating plan for each IOS (Streetcar 1 and Streetcar 2), determination of <br />the number of vehicles required to support each IOS, review and modification of the O&M <br />facility layouts to reflect phased implementation of the project, and preparation of capital and <br />operating cost estimates for each IOS. <br />Alternatives Analysis <br />The Alternatives Analysis currently underway, will be modified to include discussion of the IOS's. <br />Within the context of the appropriate full length Build Alternative, analysis of the IOS's relative <br />to the evaluation criteria and measures of effectiveness will be prepared. The purpose will be to <br />describe the advantages and disadvantages of the IOS's as a component of the full Build <br />Alternative, thereby highlighting the relative advantages/disadvantages of one Build Alternative <br />compared to another in terms of phased implementation. The results of the detailed evaluation <br />of the Build Alternatives and the IOS's will be documented in the Alternatives Analysis Report, to <br />be used in conjunction with the Draft EIR/EA towards the selection of a Locally Preferred <br />Alternative. <br />Draft EIR/EA <br />The Cordoba Team will modify the Administrative Draft Environmental Document and the <br />relevant technical reports to include analysis for the two IOS's. Analysis for IOS 1 and 2 will <br />largely be presented in terms of how the environmental impacts for the IOS's would differ from <br />the full length Build Alternatives. While the discussion of these environmental impacts would be <br />largely qualitative and based on the analyses conducted for the full length Build Alternatives, in <br />some areas of the Administrative Draft Environmental Document and Technical Reports, specific <br />discussion will be added to describe any localized impacts in the vicinity of the western terminus <br />station at Raitt that would be attributable to the IOS's as opposed to the full length Build <br />Alternatives. <br />The Cordoba Team will also provide the draft language that will be used to introduce the IOS's <br />as part of Chapter 2 of the Draft EIR/EA and applicable technical reports. <br />25G-5