Laserfiche WebLink
^?O? <br />. _ INVOICE <br />? ?ekra-L?te ORD022363 <br />Date <br />Decoration Innovation 10/26/2011 <br />3102 W.Alton Ave. Ph: (714) 436-0705 <br />Santa Ana, CA 92704 Fax: (714) 436-0612 <br />www.dekra-lite.com <br />BILL TO: SHIP TO: <br />CITY OF SANTA ANA CITY OF SANTA ANA <br />20 CIVIC CENTER PLAZA, M-25 ARTISTS VILLAGE <br />PO BOX 1988 SANTA ANA CA <br />SANTA ANA CA 92701 <br />TERiEGGERS <br />PHONE (714) 647-6563 Ext. 0000 INCTAI.I. I?,4TF. NOV 2011-NOV 2012 <br />FAX (714) 647-6549 Ext. 0000 REMOVAL DATE <br />PO Number Customer ID Salesperson ID Shipping Method Payment Terms R eq Ship Date Master No. <br />SAN025 SJ SERVICE Net 30 11/16/2011 35,398 <br />Ordered, Item Number Description Unit Price Ext. Price <br />1 LABORIRS Snowfall Overlay installation, maintenance, removal $1,200.00 $1,200.00 <br /> and storage of (8) Snowfall Sets, (40) tubes, <br /> (10)per tree installed in 4 trees. <br /> INSTALL OCT 24-28, 2011 <br /> REMOVAL JAN 5-15, 2012 <br />1 MATERIAL LED Low Voltage Clip Light Materials $583.33 $58333 T <br />1 LABOROTHER Maintenance of existing Low Voltage Lighting $666.67 $666.67 <br /> in the Artists Village Trees. DEC. 2011 <br />1 MATERIAL LED Low Voltage Clip Light Materials $583.33 $583.33 T <br />I LABOROTHER Maintenance of existing Low Voltage Lighting $666.67 $666.67 <br /> n the Artists Village Trees. MARCH 2011 <br />1 MATERIAL LED Low Voltage Clip Light Materials $58333 $58333 T <br />1 LABOROTHER Maintenance of existing Low Voltage Lighting $666.67 $666.67 <br /> n the Artists Village Trees. JUNE. 2011 <br />1 MATERIAL LED Low Voltage Clip Light Materials $583.33 $58333 T <br />1 LABOROTHER Maintenance of existing Low Voltage Lighting $666.67 $666.67 <br /> n the Artists Village Trees. SEPT. 2011 <br />1 NOTE: Anv additional trips for Low Voltage Lighting $0.00 $0.00 T <br /> repair will be billed at $95.00/hour, minimum 2 <br /> hours plus materials. <br /> <br />- Subtotal $6,200.00 <br />Tax $180.84 <br />Freight $0.00 <br />Total $6,3 80.84 <br />Amount Due Upon Acceptance of Proposal $6,380.84 <br />Balance Due Upon Installation or Delivery $0.00