My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
55A - RESOLUTION CERTIFYING EIR SAN LORENZO SEWER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:08:49 PM
Creation date
1/12/2012 2:59:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter I Introduction EXHIBIT "A" <br />Chapter 1 - Introduction <br />The City of Santa Ana (City) adopts the following Findings of Fact in connection with the San <br />Lorenzo Lift Station Project (Project). Such Findings must be adopted by the City pursuant to the <br />requirements of Section 21081 of the California Environmental Quality Act (CEQA) (Public <br />Resources Code §21000 et seq.) and Section 15091 of the State CEQA Guidelines (CEQA <br />Guidelines) (14 Cal. Code Regs. §15000 et seq.) prior to approval of a project for which an <br />Environmental Impact Report (EIR) has been certified which identifies one or more significant <br />environmental effects. The City also adopts the Statement of Overriding presented in Chapter 4 of <br />this document, which provides the specific reasons that the Project's economic, legal, social, <br />technological, or other benefits outweigh its adverse environmental impacts. <br />This document is organized as follows: <br />Chapter 1 Introduction to CEQA Findings of Fact and Statement of Overriding <br />Considerations. <br />Chapter 2 CEQA Findings of Fact regarding the significant environmental impacts of <br />the Project and the mitigation measures for those impacts identified in the <br />Environmental Impact Report (EIR) prepared for the Project and adopted as <br />conditions of approval. <br />Chapter 3 Findings regarding the alternatives to the Proposed Project evaluated in the <br />EIR and the reasons that such alternatives were rejected or accepted. <br />Chapter 4 Statement of Overriding Considerations explaining the specific reasons that <br />the Project's economic, legal, social, technological, or other benefits <br />outweigh its adverse environmental impact. <br />Brief Project Description <br />The Project area is located at the western terminus of San Lorenzo Avenue, immediately north of <br />West Segerstrom Avenue and south of an existing alley. The Project would replace the existing <br />Segerstrom Lift Station, which is located beneath South Bristol Street approximately 700 feet to the <br />west of the new lift station site. <br />The Project will consist of a newly constructed lift station that will be housed within an <br />approximately 8 -foot by 30 -foot block structure, measuring approximately 17 feet in height. The <br />following facilities will be installed within or beneath the block structure: electrical panels and <br />control center; a below - ground wet well of sufficient size and depth to prevent back up and <br />surcharging of the upstream sewer mains; a below - ground dry well to house the pumps, motors, <br />associated equipment and appurtenances; a gravity odor control system; and a stairway access into <br />the dry well. <br />Landscaping and hardscape improvements are included as part of the new lift station. The Project <br />includes the repaving of a portion of the western end of San Lorenzo Avenue, portions of an existing <br />San Lorenzo Lift Station EIR (Project No. 06 -3510) 1 -1 <br />CEQA Findings of Fact/Statement of Overriding Cgnsi era AS2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.