Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> 12.2.2 Contractor shall provide any areas of the turf supplemental watering <br /> <br /> using a garden hose on an as needed basis to assure a high quality turf <br /> infield. <br /> 12.2.3 Infield turf shall be fertilized two (2) times per year in the first week of <br /> January and April per the agronomic plan. <br /> <br /> 12.2.4 Contractor shall distribute the fertilizer evenly using a mechanical <br /> broadcaster. No hand distribution will be allowed. <br /> <br /> <br /> 12.2.5 Immediately following fertilization the Contractor shall water in the <br /> fertilizer to avoid chemically "burning" the turf. <br /> <br /> 12.3 Infield turf shall be aerated using a walk behind piston type aerator as often as deemed <br /> necessary by Staff. <br /> 12.4 Infield turf shall be kept weed free at all times. <br /> 12.4.1 Any grasses other than the original hybrid Bermuda installed in the <br /> infield shall be eradicated immediately upon notice. The Contractor may <br /> choose the method of eradication, however, may not damage the turf. <br /> <br /> 12.4.2 Any broadleaf weeds shall be eradicated immediately upon notice. The <br /> Contractor may choose the method of eradication, however, may not <br /> damage the turf. <br /> 12.5 Infield turf shall be kept free of disease and rodents at all times. <br /> <br /> <br /> 12.5.1 The Contractor shall be responsible for identifying and treating any <br /> diseases or rodents immediately upon notice. <br /> 12.6 Infield turf annual renovation <br /> <br /> 12.6.1 Each year the infield turf shall be renovated: 1) verticut using the greens reel <br /> mowers straight blade reels; 2) mowed to 1/4" high immediately following <br /> verticutting; 3) overseeded with Stovers Seed Company Sahara Dunes at a rate <br /> of 8 pounds of seed per 1,000 square feet; and, 4) top dressed immediately <br /> following seeding by Materials using "Santa Ana Top Dress Mix." <br /> <br /> 13.0 General Contract Provisions <br /> <br /> 13.1 Contractor shall provide and is responsible for all equipment necessary to carry out the <br /> work outlined in the contract. There will be no available storage for equipment. <br /> Contractor will be responsible for bringing in and then removing all equipment <br /> necessary to carry out the work outlined in the contract. <br /> <br /> <br /> <br /> <br /> <br /> 39 <br /> 25H-49 <br />