My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WISE PLACE -2011
Clerk
>
Contracts / Agreements
>
W
>
WISE PLACE -2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 10:38:57 AM
Creation date
1/19/2012 12:49:26 PM
Metadata
Fields
Template:
Contracts
Company Name
WISEPlace
Contract #
A-2011-089
Agency
Community Development
Insurance Exp Date
1/1/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<s <br />In addition to day -to -day cleaning and good <br />nutrition: <br />You can temporarily reduce lead hazards <br />by taking actions such as repairing dam- <br />aged painted surfaces and planting grass <br />to cover soil with high lead levels. These <br />actions (called "interim controls ") are not <br />permanent solutions and will need ongo- <br />ing attention. <br />To permanently remove lead hazards, <br />you should hire a certified lead "abate- <br />ment' contractor. Abatement (or perma- <br />nent hazard elimination) methods <br />include removing, sealing, or enclosing <br />lead -based paint with special materials. <br />Just painting over the hazard with regular <br />paint is not permanent removal. <br />Always hire a person with special training <br />for correcting lead problems— someone <br />who knows how to do this work safely and <br />has the proper equipment to clean up <br />thoroughly. Certified contractors will employ <br />qualified workers and follow strict safety <br />rules as set by their state or by the federal <br />government. <br />Once the work is completed, dust cleanup <br />activities must be repeated until testing <br />indicates that lead dust levels are below the <br />following: <br />40 micrograms per square foot (Ng/ft2) <br />for floors, including carpeted floors; <br />250 jig/ft2 for interior windows sills; and <br />400 Ng/ft2 for window troughs. <br />Call your state or local agency (see bottom <br />of page 1 1) for help in locating certified <br />professionals in your area and to see if <br />financial assistance is available. <br />Attachment 11 Page of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.